BAFS Flight Line Debris and Restoration

Solicitation numberFA521526R0013

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA5215 766 ESS PKP

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 6:00 PM UTC
Deadline status6 days remaining
PostedAug 31, 2026
Record refreshedSep 1, 2026
Place of performanceWaimanalo, HI, 96795, United States

Opportunity summary

Source-cited

This solicitation requires the removal of debris, vegetation, and other materials from Bellows Air Force Station to support invasive species management. The project is a Small Business Set Aside and is located in Waimanalo, HI. [1]

Key points

  • Removal of vehicles, debris, and 7 acres of vegetation [1]
  • Set-aside is for Small Business - Total [1]

Watch items

  • Response deadline is September 9, 2026 [1]
  • Performance location is Waimanalo, HI [1]

Sources

  1. Official SAM.gov noticeThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

5 citations · 1 source

The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area.

Scope

This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP).

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0004* Changes made to the due dates within this solicitation and Attachment 7 RFP 0004. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0004 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170

What changed

Aug 31, 2026 · 2 fields changed
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0005* Changes made to PWS Changes made to Additional Clauses Changes made to Itemized Price List Changes made to the due dates within this solicitation and RFP Attached Answers to RFI in QA Worksheet Reference the attached documents: Attachment 1 PWS _8.28.26 Attachment 3 Additional Clauses_8.28.26 Attachment 5 Itemized Price List_8.28.26 Attachment 6 RFP_8.28.26 Attachment 7 QA Worksheet_8.28.26 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170 Contracting Officer: Brianna Davis: brianna.davis.6@us.af.mil 808-789-3171The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0004* Changes made to the due dates within this solicitation and Attachment 7 RFP 0004. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0004 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Documents7Removed
Aug 31, 2026 · 2 fields changed
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0004* Changes made to the due dates within this solicitation and Attachment 7 RFP 0004. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0004 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0005* Changes made to PWS Changes made to Additional Clauses Changes made to Itemized Price List Changes made to the due dates within this solicitation and RFP Attached Answers to RFI in QA Worksheet Reference the attached documents: Attachment 1 PWS _8.28.26 Attachment 3 Additional Clauses_8.28.26 Attachment 5 Itemized Price List_8.28.26 Attachment 6 RFP_8.28.26 Attachment 7 QA Worksheet_8.28.26 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170 Contracting Officer: Brianna Davis: brianna.davis.6@us.af.mil 808-789-3171
DocumentsNot previously reported7
Aug 28, 2026 · 1 field changed
Documents9Removed
Aug 28, 2026 · 3 fields changed
Response deadline2026-08-31T18:00:00+00:002026-09-09T18:00:00+00:00
Archive date2026-09-152026-09-24
Documents69
Aug 20, 2026 · 3 fields changed
Response deadline2026-08-24T18:00:00+00:002026-08-31T18:00:00+00:00
Archive date2026-09-082026-09-15
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0003* Made edits to details highlighted in yellow within Attachment 1 PWS BAFS Flightline Amendment 0003. Adjusted Attachment 5 Itemized Price List Amendment 0003 to incorporate additional price page. Removed Attachment 6 Map and Address to Site Visit. Made changes to dates and details. All changes are highlighted in orange within Attachment 7 RFP Amendment 0003. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0003 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0004* Changes made to the due dates within this solicitation and Attachment 7 RFP 0004. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0004 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Aug 16, 2026 · 4 fields changed
Response deadline2026-08-21T18:00:00+00:002026-08-24T18:00:00+00:00
Archive date2026-09-052026-09-08
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0002* Made changes to Evaluation Criteria listed in section 5. All changes are highlighted in yellow within attachment 7. RFP Amendment 0002. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amendment 0002 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0003* Made edits to details highlighted in yellow within Attachment 1 PWS BAFS Flightline Amendment 0003. Adjusted Attachment 5 Itemized Price List Amendment 0003 to incorporate additional price page. Removed Attachment 6 Map and Address to Site Visit. Made changes to dates and details. All changes are highlighted in orange within Attachment 7 RFP Amendment 0003. Reference the attached documents: 1. Attachment 1 PWS BAFS Flightline Amendment 0003 2. Attachment 2 Provisions and Clauses 3. Attachment 3 Additional Clauses 4. Attachment 4 SCA Wage Determination 5. Attachment 5 Itemized Price List Amendment 0003 7. Attachment 7 RFP Amendment 0003 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Documents76
Aug 5, 2026 · 1 field changed
DocumentsNot previously reported7
Aug 5, 2026 · 1 field changed
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amended Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0002* Made changes to Evaluation Criteria listed in section 5. All changes are highlighted in yellow within attachment 7. RFP Amendment 0002. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amendment 0002 Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Aug 3, 2026 · 2 fields changed
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0001* Changed the Solicitation Request to Flight Line Debris Clearance and Restoration on Bellows Air Force Station (BAFS) The site visit date is scheduled for August 7, 2026, 10:00 AM HST. Important Site Visit information added: If interested in attending the site visit please be at the address listed on Attachment 6 on August 7, 2026, 10:00 AM HST. Contracting team will be entering BAFS on August 7, 2026, 10:00 AM HST. Anyone not at specified location at that time will not be permitted to attend the site visit, so please plan accordingly. If interested in attending the site visit, please notify Contracting Specialist A1C Michael R. Perreira michael.perreira.3@us.af.mil and Contracting Officer SSgt Thomas D. Hembree thomas.hembree@us.af.mil NLT Thursday August 6, 2026 at 10:00 AM HST. Please limit the number of attendees to 2 people per company and ensure both parties have a Real ID to gain access to the installation. 4.The pages in the PWS have been numbered 5. Added Attachment 6 - Map and Address of the Parking site for site visit. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amended Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amended Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170
Documents7Removed
Aug 3, 2026 · 2 fields changed
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. Reference the attached documents; 1. Performance Work Statement 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. RFP Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. *AMENDMENT 0001* Changed the Solicitation Request to Flight Line Debris Clearance and Restoration on Bellows Air Force Station (BAFS) The site visit date is scheduled for August 7, 2026, 10:00 AM HST. Important Site Visit information added: If interested in attending the site visit please be at the address listed on Attachment 6 on August 7, 2026, 10:00 AM HST. Contracting team will be entering BAFS on August 7, 2026, 10:00 AM HST. Anyone not at specified location at that time will not be permitted to attend the site visit, so please plan accordingly. If interested in attending the site visit, please notify Contracting Specialist A1C Michael R. Perreira michael.perreira.3@us.af.mil and Contracting Officer SSgt Thomas D. Hembree thomas.hembree@us.af.mil NLT Thursday August 6, 2026 at 10:00 AM HST. Please limit the number of attendees to 2 people per company and ensure both parties have a Real ID to gain access to the installation. 4.The pages in the PWS have been numbered 5. Added Attachment 6 - Map and Address of the Parking site for site visit. Reference the attached documents: 1. Performance Work Statement Amended 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. Map and Address to Site Visit 7. RFP Amended Point of contact: Contracting Specialist: A1C Michael R. Perreira: michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree: thomas.hembree@us.af.mil 808-789-3170
Documents67
Jul 31, 2026 · 6 fields changed
Notice typeSources SoughtSolicitation
Response deadline2026-07-28T23:00:00+00:002026-08-21T18:00:00+00:00
Archive date2026-07-292026-09-05
Set-asideTotal Small Business Set-Aside (FAR 19.5)Small Business Set Aside - Total
DescriptionThe project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170The project priority is removal of all vehicles, tires, debris, scrap metal, large rocks, 7 acres of plants and vegetation, asphalt piles, DRMO assets, from within the project area. This project will support Bellows Air Force Station (BAFS) complete invasive species management requirements from the 2025 BAFS Integrated Natural Resource Management Plan (INRMP). The project priority is removal and mulching of all vegetation including invasive ironwood trees (Casuarina equisetifolia) and the resulting wood product from within the project area. This route is also used in emergency scenarios by first responders to transport patients in critical condition. In the current state, it is unsafe to transport patients. These vegetation piles, asphalt piles, and DRMO assets all have Environmental CRB impacts and hazards. The current area is a fire hazard and needs to be eradicated appropriately through proper disposal channels. Reference the attached documents; 1. Performance Work Statement 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. RFP Point of contact: Contracting Specialist: A1C Michael R. Perreira michael.perreira.3@us.af.mil 808-789-3167 Contracting Officer: SSgt Thomas Hembree thomas.hembree@us.af.mil 808-789-3170
DocumentsNot previously reported6

Notice history

  • Solicitation · LatestPosted Aug 31, 2026 · response deadline Sep 9, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 31, 2026 · response deadline Sep 9, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 28, 2026 · response deadline Sep 9, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 28, 2026 · response deadline Sep 9, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 20, 2026 · response deadline Aug 31, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 16, 2026 · response deadline Aug 24, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 5, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 5, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 5, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 3, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • SolicitationPosted Aug 3, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • SolicitationPosted Jul 31, 2026 · response deadline Aug 21, 2026, 6:00 PM UTC
  • Sources SoughtPosted Jul 25, 2026 · response deadline Jul 28, 2026, 11:00 PM UTC