Scope
The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting.
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA5606 52 CONS DA LGC
This opportunity involves leasing a 19,000-21,000L Liquid CO2 ISO tank and providing ongoing maintenance at a location in Spangdahlem, DEU. The contractor must ensure the tank is filled to 90% capacity upon completion of the contract. [3]
REPORTS: The contractor shall prepare and submit a written report in English within three business days after preventative maintenance and unscheduled service calls are completed.
INSTRUCTIONS TO OFFERORS (Addendum to RFO 52.212-1) To be considered for evaluation, quotes must include Price and Technical submissions: 1.
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality; (3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and (4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel. (c) The requirements of this clause do not apply to any subcontractor that is – (1) A foreign government; (2) A representative of a foreign government; or (3) A foreign corporation wholly owned by a foreign government. (d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from: the Foreign Clearance Guide, accessible through the Aircraft and Personnel Automated Clearance System (APACS) at htt//apacs.milcloud.mil/fcg/index.html.
The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting.
REPORTS: The contractor shall prepare and submit a written report in English within three business days after preventative maintenance and unscheduled service calls are completed.
Supplier Performance Risk System (SPRS) (accessed via PIEE) EVALUATION FACTORS: PRICE: A quote’s Total Evaluated Price (TEP) will be determined by the sum of all separately priced CLINs as presented on the combined synopsis/solicitation, including option line items.
INSTRUCTIONS TO OFFERORS (Addendum to RFO 52.212-1) To be considered for evaluation, quotes must include Price and Technical submissions: 1.
Set-aside: No Set aside used
Spangdahlem, DE-RP, 54529, DEU
Posted Aug 18, 2026; Responses due Sep 8, 2026, 8:00 AM UTC; Archive date Sep 23, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
A 19,000-21,000L Liquid CO2 ISO tank will be placed in the Aerospace Ground Equipment (AGE) yard outside of Building 204 and connected to the Dry Ice Production Hub (DIPH) manufactured by Cold Jet. The tank should be filled to 90% of the capacity of the tank with LCO2 and ready for operation after contract completion. The Contractor shall also provide ongoing maintenance of the tank system for the duration of the contract.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.