Eligibility
Set-aside: Small Business Set Aside - Total
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA8132 AFSC PZIMC
This solicitation requires various components including Radyne Power Supplies and thermal control packages for temperature regulation within +-5 degrees. The contract is a Small Business Set Aside, with a response deadline of September 5, 2026. [1]
Two (2) each, Radyne Versa Power-Xtreme 15kW Power Supply, PN 15VXLTB480P: - Two (2) each, Thermal Control Package with K-Type Thermocouple - Two (2) each, Water cooled power leads - One (1) each, Shipping CIP Tinker AFB - One (1) each, Equipment Test Prior to Shipment - One (1) each, Program/Equipment Management - One (1) each, Manuals and Equipment Documentation These machines MUST be able to control a temperature set point within +-5 degrees.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Two (2) each, Radyne Versa Power-Xtreme 15kW Power Supply, PN 15VXLTB480P: - Two (2) each, Thermal Control Package with K-Type Thermocouple - Two (2) each, Water cooled power leads - One (1) each, Shipping CIP Tinker AFB - One (1) each, Equipment Test Prior to Shipment - One (1) each, Program/Equipment Management - One (1) each, Manuals and Equipment Documentation These machines MUST be able to control a temperature set point within +-5 degrees.
Set-aside: Small Business Set Aside - Total
F3YCEB OC ALC OBC AF BPN NO MLSBLS PROC CP40573947613001 STAFF DR DOOR G70 POST N68 TINKER AFB, OK 73145-3303, 73145
Posted Aug 19, 2026; Responses due Sep 5, 2026, 5:59 AM UTC; Archive date Oct 5, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Two (2) each, Radyne Versa Power-Xtreme 15kW Power Supply, PN 15VXLTB480P: - Two (2) each, Thermal Control Package with K-Type Thermocouple - Two (2) each, Water cooled power leads - One (1) each, Shipping CIP Tinker AFB - One (1) each, Equipment Test Prior to Shipment - One (1) each, Program/Equipment Management - One (1) each, Manuals and Equipment Documentation These machines MUST be able to control a temperature set point within +-5 degrees. This may require implementation of an external PLC equipped with PID controls.
No field-level changes were detected between related notices.
No attachments are currently listed.