Place of performanceTinker AFB, OK, 73145, United States
Opportunity summary
Source-cited
This solicitation is for the renovation of the Pratt & Whitney Area at Tinker AFB, Oklahoma, and is designated as a Small Business Set Aside - Total. Proposals are due on September 11, 2026, at 2 PM CST, and the posting date was August 21, 2026. [3]
Key points
Performance location is Tinker AFB, OK, 73145, USA. [3]
The contract is a Small Business Set Aside - Total. [3]
Watch items
Payment requests must use specific WAWF document types. [1]
Government review times are noted for schedule milestones. [2]
Sources
Solicitation+-+FA813726R0033.pdfWAWF methods of document submission. (f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions. or task or delivery order: (1) The Contractor shall submit payment requests using the following document type(s): Document type. (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. ____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that r
ATT10_STATEMENT+OF+WORKr1.pdf30 March 2026 Statement of Work - 12 of 24 WWYK260007 3.3.3 Coordination with Government Activities In developing the schedule, the Contractor shall account for the following milestones and Government review times in addition to construction activities: DELIVERY SCHEDULE & SUBMITTALS Item of Work & Deliverables Government Review Time (calendar days) Remarks Post-Award Conference/Pre-design Conference/Notice to Proceed (NTP) 1 day At Tinker AFB Baseline Schedule and Schedule of Values/Draft Progress Report 14 days Provide within 10 days of NTP 65% Design Submittal 14 days
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
Additional information on contractor requirements and worker protections under the EO is available at https: //www.dol.gov/agencies/whd/government-contracts.
WAWF methods of document submission. (f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions. or task or delivery order: (1) The Contractor shall submit payment requests using the following document type(s): Document type. (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. ____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ____ (Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.) (iii) For customary progress payments based on costs incurred, submit a progress payment request.
30 March 2026 Statement of Work - 12 of 24 WWYK260007 3.3.3 Coordination with Government Activities In developing the schedule, the Contractor shall account for the following milestones and Government review times in addition to construction activities: DELIVERY SCHEDULE & SUBMITTALS Item of Work & Deliverables Government Review Time (calendar days) Remarks Post-Award Conference/Pre-design Conference/Notice to Proceed (NTP) 1 day At Tinker AFB Baseline Schedule and Schedule of Values/Draft Progress Report 14 days Provide within 10 days of NTP 65% Design Submittal 14 days
Please confirm whether subcontractor quotations/supporting pricing documentation are required to be submitted with the proposal or whether such documentation may be requested during post submission evaluation or negotiations.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 06- August 21, 2026 1. Additional RFIs due Wednesday August 26, 2026 2PM CST. Email CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil . 2. RFPs due date September 11, 2026, 2PM CST. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 05- August 17, 2026 1. Environmental Report Attached as: Environmental Report. 2.Proposal Due Date: September 11, 2026, 2PM CST. 3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
What changed
Aug 21, 2026 · 1 field changed
DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 05- August 17, 2026 1. Enviromental Report Attached as: Enviromental Report. 2.Proposal Due Date: September 11, 2026, 2PM CST. 3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 06- August 21, 2026 1. Additional RFIs due Wednesday August 26, 2026 2PM CST. Email CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil . 2. RFPs due date September 11, 2026, 2PM CST. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 05- August 17, 2026 1. Environmental Report Attached as: Environmental Report. 2.Proposal Due Date: September 11, 2026, 2PM CST. 3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
Aug 17, 2026 · 2 fields changed
DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 05- August 17, 2026 1. Enviromental Report Attached as: Enviromental Report. 2.Proposal Due Date: September 11, 2026, 2PM CST. 3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.Documents1011
Aug 11, 2026 · 3 fields changed
Response deadline2026-09-14T19:00:00+00:002026-09-11T19:00:00+00:00DescriptionUPDATE 04- August 10, 2026 1) Soliciation will be extended for 30 days until August 12, 2026 2PM CST. 2) This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 04- August 11, 2026 1) Soliciation will be extended for 30 days. 2) New due date for proposals: September 11, 2026, 2PM CST. 3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30 4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil . This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.DocumentsNot previously reported10
Aug 11, 2026 · 1 field changed
DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.UPDATE 04- August 10, 2026 1) Soliciation will be extended for 30 days until August 12, 2026 2PM CST. 2) This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
Response deadline2026-07-08T19:00:00+00:002026-07-18T19:00:00+00:00Archive date2026-07-232026-08-02DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 03-July 7, 2026 1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment 2) New due date for proposals will be provided when the new information is recieved and provided to all contractors. 3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions. This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.Documents89
Jun 24, 2026 · 4 fields changed
Response deadline2026-06-25T19:00:00+00:002026-07-08T19:00:00+00:00Archive date2026-07-102026-07-23DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 02- June 24, 2026 1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026 2) Proposal Response Date: 08 July 2026 at 2PM CST. 3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.Documents78
May 28, 2026 · 4 fields changed
Response deadline2026-06-11T19:00:00+00:002026-06-25T19:00:00+00:00Archive date2026-06-262026-07-10DescriptionThis posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.This posting is for Tinker AFB - MAC BOA Holders ONLY. UPDATE 01 - May 28, 2026 1) Site Visit was held and concluded on May 28, 2026. 2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026. 3) Sign in sheet has been added to the attachments. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 -- B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.Documents67
Notice history
Solicitation · LatestPosted Aug 21, 2026 · response deadline Sep 11, 2026, 7:00 PM UTC
SolicitationPosted Aug 17, 2026 · response deadline Sep 11, 2026, 7:00 PM UTC
SolicitationPosted Aug 11, 2026 · response deadline Sep 11, 2026, 7:00 PM UTC
SolicitationPosted Aug 11, 2026 · response deadline Sep 14, 2026, 7:00 PM UTC
SolicitationPosted Aug 10, 2026 · response deadline Sep 14, 2026, 7:00 PM UTC