The USAF requires a system to address Degraded Visual Environments (DVE) for the HH-60W helicopter, including design, development, and integration of DVES kits. The potential contract period is eight years, starting with a base period of twenty-four months. [1]
Key points
System must provide real-time hazard detection in various DVEs. [1]
Contract includes material solution and all non-recurring engineering. [1]
Solicitation+Amendment+-+FA855226RB0010001.pdfThe Government may issue orders requiring delivery to multiple destinations or performance at multiple locations. (c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule. (d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract. (e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an ord
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations. (c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule. (d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract. (e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source. (f) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order.
The Contractor shall- Subcontracts (1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23. (End of clause) 252.232-7007 Limitation of Government's Obligation. (Apr 2014) LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014) (a) Contract line item(s) is/are incrementally funded.
The Contractor must submit EVMS reports as required by the contract. (b) If the Contractor's EVM System is not compliant with the requirements in paragraph (a) of this clause, or the Contractor's existing cost/schedule control system is not compliant with the guidelines in EIA-748 (current version at time of award), the Contractor must- (1) Apply the current system to the contract; and (2) Take necessary actions to meet the milestones in the Contractor's approved EVMS plan. (c) When an EVMS is required, the Government will conduct an Integrated Baseline Review (IBR).
FAR 15.110(v)FAR 52.215-22FAR 52.215-23 Excessive Pass-through Charges- Identification of Subcontract Effort: If the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify: (i) the amount of the offeror's indirect costs and profit applicable to the work to be performed by the proposed subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the proposed subcontractor(s)? ____ ____ (End of provision) FA855226RB0010001 Page 75 of 76 Section M - Evaluation Factors for Award See Attachment 15 Section M - Evaluation Basis for Award FAR Clauses Incorporated by Reference Number Title Effective Date Alternate/ Deviation Variation Effective Date 52.217-3 Evaluation Exclusive of Options.
The offeror further certifies that if an award resulting from this proposal has not been made within 90 days after the end of that period, the offeror will immediately submit a revised certificate to the Contracting Officer, in the form specified under paragraph (c)(1) or (c)(2) of part I of this provision, as appropriate, to verify submission of a completed Disclosure Statement.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). RFP Amendment 03 updated the following attachments: Attachment 15 Section M - Evaluation Basis for Award. Questions and Answers - uploaded on 04 August 2026. Updated 05 August 2026. Updated 18 August 2026.
What changed
Aug 18, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). Questions and Answers - uploaded on 04 August 2026. Updated 05 August 2026.Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). RFP Amendment 03 updated the following attachments: Attachment 15 Section M - Evaluation Basis for Award. Questions and Answers - uploaded on 04 August 2026. Updated 05 August 2026. Updated 18 August 2026.Documents2122
Aug 5, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI).Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). Questions and Answers - uploaded on 04 August 2026. Updated 05 August 2026.DocumentsNot previously reported21
Aug 4, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). Questions and Answers - uploaded on 04 August 2026.Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI).Documents21Removed
Aug 4, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI).Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI). Questions and Answers - uploaded on 04 August 2026.Documents2021
Jul 31, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for OfferorsDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors. RFP Amendment 02 updated the following attachments: Attachment 11 Cost Model, Attachment 14 Section L - Instructions to Offerors, Attachment 15 Section M - Evaluation Basis for Award, Attachment 16 Performance Work Statement (PWS)(CUI), and Attachment 19 SRD (CUI).Documents1820
Jul 17, 2026 · 2 fields changed
DescriptionDescription of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years.Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for OfferorsDocuments1918
Jul 10, 2026 · 1 field changed
DocumentsNot previously reported19
Jul 10, 2026 · 1 field changed
Documents24Removed
Jul 9, 2026 · 1 field changed
DocumentsNot previously reported24
Notice history
Solicitation · LatestPosted Aug 18, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Aug 5, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Aug 4, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Aug 4, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 31, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 17, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 15, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 10, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 10, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 10, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 9, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
SolicitationPosted Jul 9, 2026 · response deadline Oct 8, 2026, 8:00 PM UTC
Attachments
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.