Place of performanceKirtland AFB, NM, 87117, United States
Opportunity summary
Source-cited
This is an RFP for design/build construction services to renovate secure facility B1049 at Kirtland AFB, NM, which is set aside for small businesses. The project requires constructing a new enclosed storage space with a mezzanine and installing four opaque skylights. [3][1]
Solicitation+-+FA940126R0024_31+Aug+2026.pdfThe following factors will be used to evaluate offers: The attached document ("Evaluation Criteria - B1049") details the evaluation factors (Technical, Past Perormance, and Price) being used as the basis for award. (b) .
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
Page 4 of 9 (2) Security incidents occurring at government performance locations where the contractor is categorized as a visitor will be processed and reported in accordance with government host security procedures. (3) Security incidents involving the potential or actual loss, compromise, or suspected compromise of Special Access Program and/or Sensitive Compartmented Information is under the jurisdiction of the GCA and the contractor shall follow GCA guidance in lieu of this requirement. (4) This requirement does not relieve the contractor from reporting requirements set forth in 32 CFR Part 117, DFARS 252.204-7012, or as otherwise directed by contract requirements and/or its Cognizant Security Office (e.g., Defense Counterintelligence and Security Agency). (5) This requirement does not relieve the contractor from adhering to security incident guidance set forth by its Cognizant Security Office (e.g., Defense Counterintelligence and Security Agency). (6) The contractor is responsible for ensuring all applicable subcontracts include these security incident reporting requirements. (7) If the lost or compromised information is beyond the jurisdiction of the U.S.
The following factors will be used to evaluate offers: The attached document ("Evaluation Criteria - B1049") details the evaluation factors (Technical, Past Perormance, and Price) being used as the basis for award. (b) .
Instructions, Conditions, & Notices to Offerors or Quoters RFO 52.212-1 Instructions to Offerors - Commercial Products and Services (Deviation Date) Addendum a) The contract provision pertinent to this section is RFO 52.212-1, which has been incorporated by reference. b) Submission of Proposals.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
UPDATES: Amendment 001: The clause '52.211-12, Liquidated Damages-Construction" has been added to the attached solicitation document titled "Solicitation - FA940126R0024_31 Aug 2026". 14 August 2025: Answers to all questions received thus far have been posted in the attachments section. Additional questions may be submitted until before 02 September 2026 at 4:00 MST. --------------------------------------------- IMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. (End of description)
What changed
Aug 31, 2026 · 1 field changed
DescriptionUPDATES: 14 August 2025: Answers to all questions received thus far have been posted in the attachments section. Additional questions may be submitted until before 02 September 2026 at 4:00 MST. --------------------------------------------- IMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. (End of description)UPDATES: Amendment 001: The clause '52.211-12, Liquidated Damages-Construction" has been added to the attached solicitation document titled "Solicitation - FA940126R0024_31 Aug 2026". 14 August 2025: Answers to all questions received thus far have been posted in the attachments section. Additional questions may be submitted until before 02 September 2026 at 4:00 MST. --------------------------------------------- IMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. (End of description)
Aug 14, 2026 · 2 fields changed
DescriptionSITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- From the SOW: The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW.UPDATES: 14 August 2025: Answers to all questions received thus far have been posted in the attachments section. Additional questions may be submitted until before 02 September 2026 at 4:00 MST. --------------------------------------------- IMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. (End of description)DocumentsNot previously reported9
Aug 11, 2026 · 2 fields changed
DescriptionIMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. ---------------------------------------------SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- From the SOW: The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW.Documents8Removed