← Active opportunities
OpenSolicitationAmended

IND TUBULAR GAGE GL

Solicitation numberN0010423QCB55

DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSUP WEAPON SYSTEMS SUPPORT MECH

View opportunity on SAM.gov ↗
Response deadlineSep 21, 2026, 8:30 PM UTC
Deadline status18 days remaining
PostedAug 24, 2026
Record refreshedAug 25, 2026

Opportunity summary

Source-cited

This solicitation from the Department of Defense is for the repair of an IND TUBULAR GAGE GL, with a response deadline of September 21, 2026. The contract requires a Repair Turnaround Time (RTAT) of 116 Days and is issued under Emergency Acquisition Authority (EAA). [1]

Key points

  • The scope requires repair of the IND TUBULAR GAGE GL. [1]
  • A required Repair Turnaround Time (RTAT) of 116 Days is specified. [1]

Watch items

  • The solicitation is issued pursuant to Emergency Acquisition Authority (EAA). [1]
  • The resultant award will be issued bilaterally, requiring written acceptance. [1]

Sources

  1. Official SAM.gov noticeThe absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

6 citations · 1 source

The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.

Scope

SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the IND TUBULAR GAGE GL .

Evaluation

If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

Submission

SOL AMENDMENT HAS BEEN CREATED TO UPDATE THE QUOTE DELIVERY WINDOW AND PULL IN THE CLAUSES IN ACCORDANCE WITH THE FAR OVERHAUL.THIS UPDATES THE PRICING THRESHOLDS AS WELL.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

CONTACT INFORMATION|4|N771.2|HQG|Refer to email|jaclyn.i.phillips.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| Amendment to extend solicitation and update clauses. Amendment to update clauses and extend commercial repair solicitation. SOL AMENDMENT HAS BEEN CREATED TO UPDATE THE QUOTE DELIVERY WINDOW AND PULL IN THE CLAUSES IN ACCORDANCE WITH THE FAR OVERHAUL.THIS UPDATES THE PRICING THRESHOLDS AS WELL. This amendment is to notify the vendor of a qty increase from one unit to two units. \ This solicitation is issued pursuant to Emergency Acquisition Authority (EAA). Accelerated delivery is encouraged and accepted before the delivery date(s)listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will beissued bilaterally, requiring the contractor's written acceptance prior toexecution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 116 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial AssetVisibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT - Unit Price:__________ - Total Price:__________ - Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time(RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptanceunder the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor'sfacility as reflected in the Action Date entry in the Commercial AssetVisibility (CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered in CAVmust be dated to reflect the actual date of physical receipt. The Contractormust obtain final inspection and acceptance by the Government for all assetswithin the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR,and the contractor provides documentation that costs were incurred duringevaluation and determination of BR, the contracting officer will negotiate areduced contract price, not-to exceed (NTE) $___________associated with therepair effort to reflect the BR status of the equipment. The T&E fee (if asset is determined BR/BER) was determined/computed basedon:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION - Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not sameas "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur aprice reduction per unit/per month the contractor is late - any delaydetermined to be excusable (e.g. Government Delay) will not result in a pricereduction. If a price reduction is required due to unexcusable contractordelay, the Contracting Officer will implement the aforementioned price reduction via a"reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the IND TUBULAR GAGE GL . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The IND TUBULAR GAGE GL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;74965 E-283-021-20 95094 E-283-021-20; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

What changed

Aug 24, 2026 · 3 fields changed
Response deadline2026-08-14T20:30:00+00:002026-09-21T20:30:00+00:00
Archive date2026-08-292026-10-06
DescriptionCONTACT INFORMATION|4|N771.2|HQG|Refer to email|jaclyn.i.phillips.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| Amendment to update clauses and extend commercial repair solicitation. SOL AMENDMENT HAS BEEN CREATED TO UPDATE THE QUOTE DELIVERY WINDOW AND PULL IN THE CLAUSES IN ACCORDANCE WITH THE FAR OVERHAUL.THIS UPDATES THE PRICING THRESHOLDS AS WELL. This amendment is to notify the vendor of a qty increase from one unit to two units. \ This solicitation is issued pursuant to Emergency Acquisition Authority (EAA). Accelerated delivery is encouraged and accepted before the delivery date(s)listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will beissued bilaterally, requiring the contractor's written acceptance prior toexecution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 116 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial AssetVisibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT - Unit Price:__________ - Total Price:__________ - Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time(RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptanceunder the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor'sfacility as reflected in the Action Date entry in the Commercial AssetVisibility (CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered in CAVmust be dated to reflect the actual date of physical receipt. The Contractormust obtain final inspection and acceptance by the Government for all assetswithin the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR,and the contractor provides documentation that costs were incurred duringevaluation and determination of BR, the contracting officer will negotiate areduced contract price, not-to exceed (NTE) $___________associated with therepair effort to reflect the BR status of the equipment. The T&E fee (if asset is determined BR/BER) was determined/computed basedon:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION - Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not sameas "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur aprice reduction per unit/per month the contractor is late - any delaydetermined to be excusable (e.g. Government Delay) will not result in a pricereduction. If a price reduction is required due to unexcusable contractordelay, the Contracting Officer will implement the aforementioned price reduction via a"reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the IND TUBULAR GAGE GL . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The IND TUBULAR GAGE GL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;74965 E-283-021-20 95094 E-283-021-20; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLECONTACT INFORMATION|4|N771.2|HQG|Refer to email|jaclyn.i.phillips.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| Amendment to extend solicitation and update clauses. Amendment to update clauses and extend commercial repair solicitation. SOL AMENDMENT HAS BEEN CREATED TO UPDATE THE QUOTE DELIVERY WINDOW AND PULL IN THE CLAUSES IN ACCORDANCE WITH THE FAR OVERHAUL.THIS UPDATES THE PRICING THRESHOLDS AS WELL. This amendment is to notify the vendor of a qty increase from one unit to two units. \ This solicitation is issued pursuant to Emergency Acquisition Authority (EAA). Accelerated delivery is encouraged and accepted before the delivery date(s)listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will beissued bilaterally, requiring the contractor's written acceptance prior toexecution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 116 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial AssetVisibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT - Unit Price:__________ - Total Price:__________ - Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time(RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptanceunder the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor'sfacility as reflected in the Action Date entry in the Commercial AssetVisibility (CAV) system. In accordance with the CAV Statement of Work, thecontractor is required to accurately report all transactions by the end of thefifth regular business day after receipt and the Action Date entered in CAVmust be dated to reflect the actual date of physical receipt. The Contractormust obtain final inspection and acceptance by the Government for all assetswithin the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR,and the contractor provides documentation that costs were incurred duringevaluation and determination of BR, the contracting officer will negotiate areduced contract price, not-to exceed (NTE) $___________associated with therepair effort to reflect the BR status of the equipment. The T&E fee (if asset is determined BR/BER) was determined/computed basedon:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION - Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not sameas "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur aprice reduction per unit/per month the contractor is late - any delaydetermined to be excusable (e.g. Government Delay) will not result in a pricereduction. If a price reduction is required due to unexcusable contractordelay, the Contracting Officer will implement the aforementioned price reduction via a"reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the IND TUBULAR GAGE GL . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The IND TUBULAR GAGE GL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;74965 E-283-021-20 95094 E-283-021-20; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Notice history

  • Solicitation · LatestPosted Aug 24, 2026 · response deadline Sep 21, 2026, 8:30 PM UTC
  • SolicitationPosted Jul 17, 2026 · response deadline Aug 14, 2026, 8:30 PM UTC
  • SolicitationPosted Jul 17, 2026 · response deadline Aug 14, 2026, 8:30 PM UTC

Attachments

No attachments are currently listed.

Back to top ↑