Response deadlineSep 15, 2026, 9:00 PM UTC
Deadline status12 days remaining
PostedAug 18, 2026
Record refreshedAug 19, 2026
Opportunity summary
Source-citedThis solicitation seeks Alteration Installation Team (AIT) services for various systems on US Navy and Coast Guard vessels. Services include shipboard support, industrial ship services, and logistical support for specific electronic systems. [1]
Key points
- Services cover Electro-Optical, EA, and other systems. [1]
- Support is required for Navy and Coast Guard vessels. [1]
Watch items
- Response deadline is September 15, 2026. [1]
- Posted date was August 18, 2026. [1]
Sources
- Official SAM.gov notice
Alteration Installation Team (AIT) service requirements to include shipboard and technician support, industrial ship services, operational support, and logistical and material support services for Electro-Optical, Electronic Offboard Countermeasures, Fleet Demonstration and Flex Demo systems, and Electronic Attack (EA) systems onboard United States Navy and Coast Guard vessels.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
3 citations · 1 sourceAlteration Installation Team (AIT) service requirements to include shipboard and technician support, industrial ship services, operational support, and logistical and material support services for Electro-Optical, Electronic Offboard Countermeasures, Fleet Demonstration and Flex Demo systems, and Electronic Attack (EA) systems onboard United States Navy and Coast Guard vessels.
Scope
Alteration Installation Team (AIT) service requirements to include shipboard and technician support, industrial ship services, operational support, and logistical and material support services for Electro-Optical, Electronic Offboard Countermeasures, Fleet Demonstration and Flex Demo systems, and Electronic Attack (EA) systems onboard United States Navy and Coast Guard vessels.
Key dates
Posted Aug 18, 2026; Responses due Sep 15, 2026, 9:00 PM UTC; Archive date Nov 30, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.