Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038) Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
Volume II: Past Performance Offerors shall submit past performance information for up to three (3) recent and relevant contracts performed within the last three (3) years. "Recent" is defined as ongoing or completed within the past 36 months from the issuance date of this RFQ. "Relevant" is defined as similar in scope, magnitude, and complexity to the requirements described in this solicitation.
See attachment 2 for conceptual drawings. Paint and finish stairway to match existing stairways in room 19L. Applicable Unified Guise Specifications (UFGS) but not limited • 01 45 00.00 20 Quality Control • 01 74 19 Construction waste management and disposal • 01 78 00 Closeout Submittals • 02 41 00 Demolition • 05 12 00 Structural Steel • 05 50 13 Miscellaneous Metal Fabrications • 05 50 14 Structural Metal Fabrications • 05 51 00 Metal Stairs • 05 52 00 Metal Railings • 09 90 00 Paints and Coatings o Kick-Off Meeting: The Govt will plan and coordinate a kick-off meeting within two (2) weeks of contract award. o Schedule: The awardee shall provide a project schedule within three (3) weeks of contract award. o Design Submittal: For design tasks, contractors shall provide the following, when applicable: Shop Drawings Foundation/Anchoring system Drawings Miscellaneous accessories Drawings All preliminary drawings shall be submitted to the NRL Engineer in Charge (EIC) prior to any production, fabrication, or build.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
This requirement is for the fabrication and installation of interior metal stairs for the US Naval Research Laboratory (NRL), Bldg. A59. The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1903 along with attachments. A site visit is required before submitting any proposal or quote. The site visit is scheduled for Thursday, September 3, at 10:00am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified above will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.
What changed
Aug 27, 2026 · 4 fields changed
Response deadline2026-09-15T17:00:00+00:002026-09-10T17:00:00+00:00Archive date2026-09-302026-09-25DescriptionThis requirement is for the fabrication and installation of interior metal stairs for the US Naval Research Laboratory (NRL), Bldg. A59. The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1903 along with attachments. A site visit is required before submitting any proposal or quote. The site visit is scheduled for Thursday, September 10, at 10:00am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified above will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.This requirement is for the fabrication and installation of interior metal stairs for the US Naval Research Laboratory (NRL), Bldg. A59. The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1903 along with attachments. A site visit is required before submitting any proposal or quote. The site visit is scheduled for Thursday, September 3, at 10:00am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified above will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.Documents34