Scope
CONTRACTOR RESPONSIBILITIES: 4.1 General: The Contractor shall provide all support services delineated in this PWS.
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSUP FLT LOG CTR SAN DIEGO
The Department of Defense seeks Administrative Engineering Support Services for Assault Craft Unit Five at Camp Pendleton, CA, as a Small Business Set Aside. Proposals must follow a specific four-volume format, with responses due by September 11, 2026. [5]
CONTRACTOR RESPONSIBILITIES: 4.1 General: The Contractor shall provide all support services delineated in this PWS.
If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage.
The basis for award of a contract as a result of this solicitation will be an integrated assessment by the Contracting Officer of the results of the evaluation based on the evaluation factors and their importance as indicated below.
Proposal Format and Content: Offerors shall submit their proposals in the following format: Volume I- Signed Offer - Seaport NxG Solicitation Volume II - Technical Proposal Volume III - Past Performance Volume IV - Price Volume Name Number of Copies Page Limit Volume I - Proposal /Complete Solicitation (1) Unlimited Volume II - Technical** (1) (10) pages, excluding resumes, letters of intent, employment agreements, title page, table of contents, and cross-reference index list Volume III - Past Performance (1) (5) pages, excluding Offeror's Past Performance Data (OPPD) and CPARS Volume IV - Price (1) Unlimited (Excel) - Submission may also include 8-page max explanatory word document.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
52.217-5 Evaluation of Options (Jul 1990) 52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008) FAR 52.219-6 Notice of Total Small Business Set-Aside NOV 2020 FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026) 52.224-3 Privacy Training (Jan 2017) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.232-18 Availability of Funds (Apr 1984) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (Apr 1984) 52.240-92 Security Requirements DEC 2025 252.204-7000 Disclosure of Information (OCT 2016) 252.204-7003 Control of Government Personnel Work Product (APR 1992) 252.204-7012 (Dev) Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013, REVISION 1) 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services (Jan 2021) 252.240-7997 NIST SP 800-171 DoD Assessment Requirements FEB 2026 52.217-8 Option to Extend Services (Nov 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract.
CONTRACTOR RESPONSIBILITIES: 4.1 General: The Contractor shall provide all support services delineated in this PWS.
If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage.
The basis for award of a contract as a result of this solicitation will be an integrated assessment by the Contracting Officer of the results of the evaluation based on the evaluation factors and their importance as indicated below.
Proposal Format and Content: Offerors shall submit their proposals in the following format: Volume I- Signed Offer - Seaport NxG Solicitation Volume II - Technical Proposal Volume III - Past Performance Volume IV - Price Volume Name Number of Copies Page Limit Volume I - Proposal /Complete Solicitation (1) Unlimited Volume II - Technical** (1) (10) pages, excluding resumes, letters of intent, employment agreements, title page, table of contents, and cross-reference index list Volume III - Past Performance (1) (5) pages, excluding Offeror's Past Performance Data (OPPD) and CPARS Volume IV - Price (1) Unlimited (Excel) - Submission may also include 8-page max explanatory word document.
Set-aside: Small Business Set Aside - Total
Camp Pendleton, CA, USA
Posted Sep 1, 2026; Responses due Sep 11, 2026, 6:00 PM UTC; Archive date Sep 26, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This requirement is for Administrative Engineering Support Services on behalf of Assault Craft Unit Five (ACU 5) at Camp Pendleton, CA and is solicited as a SB set-aside among the SeaPort NxG MAC holders. PIEE Soliciation Module: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml-noticeId=N0024426R3109¬iceType=SolicitationNotice
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.