Response deadlineSep 20, 2026, 10:00 PM UTC
Deadline status17 days remaining
PostedAug 20, 2026
Record refreshedAug 23, 2026
Place of performanceKeyport, WA, 98345, United States
Opportunity summary
Source-citedThe Department of Defense is soliciting quotes for the installation of Crane Rail Cross Bracing at Building 514 in Keyport, WA. This is a Small Business Set Aside requirement with a response deadline of September 20, 2026. [2]
Key points
- Award will go to the lowest price, technically acceptable proposal. [1]
- The requirement is set aside for Small Business concerns. [2]
Watch items
- Offerors must provide FOB Destination pricing to NWC Keyport. [2]
- Questions must be submitted in writing as soon as practicable. [2]
Sources
- C7_N0025326Q0008.pdf
It is the responsibility of the Offeror to confirm the proposal was received prior civ@us.navy.mil jason.b.gavinski.civ@us.navy.mil to the deadline for submission and may confirm by sending an email to dane.a.jacobson3.civ@us.navy.mil and jason.b.gavinski.civ@us. . navy.mil Award will be made to the responsible Offeror submitting the lowest price, technically acceptable proposal.
- Official SAM.gov notice
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesThe Offeror's attention is directed to the "Organizational Conflict of Interest" (OCI) or similar requirement which may be contained in current or completed contract(s) which prohibits the prime or subcontractor from providing certain supplies or services to the Government as described above during the period of the current "support" contract(s) or for a period after completion of the "support" contract(s).
Scope
The contractor shall be responsible for obtaining and providing all access, licenses, and other services required for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Wage Rate Requirements (Construction) and Related Act Regulations.
Deliverables
SOW Product/Material Submittals (IF REQUIRED) Electronically with hand delivered where necessary COR for approval 21 days (3 Weeks) after award 1.11 1.12 Production Schedule / Schedule of Values (SOV) Attachment 07 Electronically Contracting Officer and COR 21 days (3 Weeks) After Award 1.13 Pre-Construction Conference In Person COR will send calendar request to contractor and Contracting Officer 21 days (3 Weeks) After Award 1.14 Weekly Production Plan and Daily progress reports Electronically Contracting Officer and COR 7 days (1 week) after Pre- Construction Conference, and daily/weekly thereafter 1.15 AS-Built Drawings (IF REQUIRED) Electronically and hard copy COR Prior to final payment
Evaluation
OFFERORS NOT COMPLYING WITH THESE RULES AND PROCEDURES MAY BE PRECLUDED FROM FURTHER SITE VISIT PARTICIPATION. (End of Provision) N0025326Q0008 Page 36 of 39 Section M - Evaluation Factors for Award Evaluation - Lowest Price Technically Acceptable The Government will award a contract resulting from this solicitation to the responsible proposal, who's Offeror conforms to the solicitation and is most advantageous to the Government, price and other factors considered.
Submission
It is the responsibility of the Offeror to confirm the proposal was received prior civ@us.navy.mil jason.b.gavinski.civ@us.navy.mil to the deadline for submission and may confirm by sending an email to dane.a.jacobson3.civ@us.navy.mil and jason.b.gavinski.civ@us. . navy.mil Award will be made to the responsible Offeror submitting the lowest price, technically acceptable proposal.
Eligibility
Set-aside: Small Business Set Aside - Total
Place of performance
Keyport, WA, 98345, USA
Key dates
Posted Aug 20, 2026; Responses due Sep 20, 2026, 10:00 PM UTC; Archive date Oct 5, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.