← Active opportunities
OpenSolicitationAmended

15--FLAP ASSY, IN REPAIR/MODIFICATION OF

Solicitation numberN0038322QD505

DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSUP WEAPON SYSTEMS SUPPORT

View opportunity on SAM.gov ↗
Response deadlineSep 11, 2026, 8:30 PM UTC
Deadline status8 days remaining
PostedAug 7, 2026
Record refreshedAug 24, 2026

Opportunity summary

Source-cited

This solicitation is for the repair, testing, and inspection of FLAP ASSY items for the Department of Defense. Key requirements include a 119-day Repair Turnaround Time and specific coating procedures for yellow paint removal. [1]

Key points

  • Articles must be repaired, tested, and inspected per requirements. [1]
  • Required Repair Turnaround Time is 119 days after asset receipt. [1]

Watch items

  • Yellow paint must be stripped and repainted with white coating. [1]
  • SAE-AS22759 series wire must be used instead of MIL-W-81381. [1]

Sources

  1. Official SAM.gov noticeSuch prices are based on the Contractor meeting the RTAT requirements described within the schedule page.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

5 citations · 1 source

Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page.

Scope

SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.

Deliverables

CONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to extend the solicitation closing date to 11 SEP 2026.

Submission

THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

CONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to extend the solicitation closing date to 11 SEP 2026. The purpose of this Amendment is to extend the solicitation closing date to 10 AUG 2026. \ The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

What changed

Aug 7, 2026 · 3 fields changed
Response deadline2026-08-10T20:30:00+00:002026-09-11T20:30:00+00:00
Archive date2026-08-252026-09-26
DescriptionCONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this Amendment is to extend the solicitation closing date to 10 AUG 2026. \ The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLECONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to extend the solicitation closing date to 11 SEP 2026. The purpose of this Amendment is to extend the solicitation closing date to 10 AUG 2026. \ The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Jul 10, 2026 · 1 field changed
DescriptionCONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLECONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this Amendment is to extend the solicitation closing date to 10 AUG 2026. \ The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Jul 10, 2026 · 3 fields changed
Notice typePresolicitationSolicitation
NAICSNot previously reported336413
DescriptionNSN 7R-1560-014560025-KB, TDP VER 001, QTY 1 EA, DELIVERY FOB ORIGIN. The Government physically does not have in its possession sufficient, accurate, or legible data to purchase this part/contract repair from other than the current source(s). Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-6396 (DSN: 442-6396), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.CONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Jul 10, 2026 · 2 fields changed
Response deadline2025-04-18T20:30:00+00:002026-08-10T20:30:00+00:00
Archive date2025-04-182026-08-25
Apr 7, 2025 · 5 fields changed
Notice typeSolicitationPresolicitation
Response deadline2024-09-26T20:30:00+00:002025-04-18T20:30:00+00:00
Archive date2024-10-112025-04-18
NAICS336413Removed
DescriptionCONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLENSN 7R-1560-014560025-KB, TDP VER 001, QTY 1 EA, DELIVERY FOB ORIGIN. The Government physically does not have in its possession sufficient, accurate, or legible data to purchase this part/contract repair from other than the current source(s). Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-6396 (DSN: 442-6396), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.
Sep 12, 2024 · 2 fields changed
NAICS333999336413
DescriptionCONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLECONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The purpose of this amendment is to increase item quantity from 1 to 3. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Sep 12, 2024 · 3 fields changed
Notice typePresolicitationSolicitation
NAICSNot previously reported333999
DescriptionNSN 7R-1560-014560025-KB, TDP VER 001, QTY 1 EA, DELIVERY FOB ORIGIN. The Government physically does not have in its possession sufficient, accurate, or legible data to purchase this part/contract repair from other than the current source(s). Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-6396 (DSN: 442-6396), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.CONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Sep 12, 2024 · 5 fields changed
Notice typeSolicitationPresolicitation
Response deadline2022-11-03T05:00:00+00:002024-09-26T20:30:00+00:00
Archive date2022-11-182024-10-11
NAICS333999Removed
DescriptionCONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLENSN 7R-1560-014560025-KB, TDP VER 001, QTY 1 EA, DELIVERY FOB ORIGIN. The Government physically does not have in its possession sufficient, accurate, or legible data to purchase this part/contract repair from other than the current source(s). Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-6396 (DSN: 442-6396), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.
Oct 4, 2022 · 5 fields changed
Notice typePresolicitationSolicitation
Response deadline2022-11-01T05:00:00+00:002022-11-03T05:00:00+00:00
Archive date2022-11-162022-11-18
NAICSNot previously reported333999
DescriptionNSN 7R-1560-014560025-KB, TDP VER 001, QTY 1 EA, DELIVERY FOB ORIGIN. The Government physically does not have in its possession sufficient, accurate, or legible data to purchase this part/contract repair from other than the current source(s). Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-6396 (DSN: 442-6396), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets the qualification requirement(s) at time of award, in accordance with FAR clause 52.209-1. The solicitation identifies the office where additional information can be obtained concerning qualification requirements and is cited in each individual solicitation.CONTACT INFORMATION|4|N721.10|B1U|609-284-3898|joshua.j.seltzer.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance bythe Government for all assets within the RTATs e established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agree to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Notice history

  • Solicitation · LatestPosted Aug 7, 2026 · response deadline Sep 11, 2026, 8:30 PM UTC
  • SolicitationPosted Jul 10, 2026 · response deadline Aug 10, 2026, 8:30 PM UTC
  • SolicitationPosted Jul 10, 2026 · response deadline Aug 10, 2026, 8:30 PM UTC
  • PresolicitationPosted Jul 10, 2026 · response deadline Aug 10, 2026, 8:30 PM UTC
  • PresolicitationPosted Apr 7, 2025 · response deadline Apr 18, 2025, 8:30 PM UTC
  • SolicitationPosted Sep 12, 2024 · response deadline Sep 26, 2024, 8:30 PM UTC
  • SolicitationPosted Sep 12, 2024 · response deadline Sep 26, 2024, 8:30 PM UTC
  • PresolicitationPosted Sep 12, 2024 · response deadline Sep 26, 2024, 8:30 PM UTC
  • SolicitationPosted Oct 4, 2022 · response deadline Nov 3, 2022, 5:00 AM UTC
  • PresolicitationPosted Sep 29, 2022 · response deadline Nov 1, 2022, 5:00 AM UTC

Attachments

No attachments are currently listed.

Back to top ↑