This solicitation requires repair services for FMS items, mandating a Repair Turnaround Time of 325 days after asset receipt. The response deadline is September 24, 2026, and performance is located in Melbourne, FL, USA. [1][5]
Key points
Required RTAT is 325 days following asset receipt. [1]
Acceptance requires scheduling an on-site visit with the QAR. [3]
Watch items
Offerors must complete and submit listed provisions with their quotation. [4]
Subcontractors must have appropriate CMMC certification. [2]
Sources
3.01_RFQ_N0038326QM076_N0038326PR0R287.pdfDec 2014 52.208-9 Contractor Use of Mandatory Sources of Supply or Services. (Deviation 2026-O0038) Feb 2026 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038) Feb 2026 52.211-5 Material Requirements. (Deviation 2026-O0038) Feb 2026 52.211-15 Defense Priority and Allocation Requirements.
3.01_RFQ_N0038326QM076_N0038326PR0R287.pdfThe Contractor shall- Subcontracts (1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcon
3.01_RFQ_N0038326QM076_N0038326PR0R287.pdfContact the Government Quality Assurance Representative (QAR) to schedule an on-site visit date for inspection and acceptance of the material, including, if required, signature or Wide Area Workflow (WAWF) authorization of the DD250 Receiving Report, which is required for payment purposes.
3.01_RFQ_N0038326QM076_N0038326PR0R287.pdfThe offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
7 citations · 6 sources
Dec 2014 52.208-9 Contractor Use of Mandatory Sources of Supply or Services. (Deviation 2026-O0038) Feb 2026 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038) Feb 2026 52.211-5 Material Requirements. (Deviation 2026-O0038) Feb 2026 52.211-15 Defense Priority and Allocation Requirements.
The Contractor shall- Subcontracts (1) Insert the substance of this clause, including this paragraph (f) and excluding paragraph (e)(1), in subcontracts and other contractual instruments, including those for the acquisition of commercial products or commercial services, excluding commercially available off-the-shelf items, if the subcontract or other contractual instrument will contain a requirement to process, store, or transmit FCI or CUI; and (2) Prior to awarding a subcontract or other contractual instrument, ensure that the subcontractor has a current CMMC certificate or current CMMC status at the CMMC level that is appropriate for the information that is being flowed down to the subcontractor based on the requirements at 32 CFR 170.23. (End of clause) 252.209-7010 Critical Safety Items. (Aug 2011) CRITICAL SAFETY ITEMS (AUG 2011) (a) .
Contact the Government Quality Assurance Representative (QAR) to schedule an on-site visit date for inspection and acceptance of the material, including, if required, signature or Wide Area Workflow (WAWF) authorization of the DD250 Receiving Report, which is required for payment purposes.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. Required RTAT: 325 days after receipt of asset The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month. A throughput of XXX per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.
What changed
No field-level changes were detected between related notices.
Notice history
Solicitation · LatestPosted Aug 25, 2026 · response deadline Sep 24, 2026, 8:00 PM UTC
Attachments
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.