Scope
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVFACSYSCOM MID-ATLANTIC
This is a Small Business Set Aside opportunity for FY26 Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning at Camp Lejeune, NC. Proposals are due by September 9, 2026, and only Mechanical MACC Contractors listed on the General Requirements cover page may submit. [2]
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The purpose of this meeting is to reach a mutual understanding of the scope of work concerning the contract requirements for eOMSI and coordinate the efforts necessary by both the Government and Contractor to ensure an accurate collection, preparation and timely Government review of eOMSI.
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
1.10.3 Required Tabular Reports and Native P6 XER Files Include the following reports with the Baseline, Monthly Update and any other required schedule submittals: a.
ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2014) Safety and Health Requirements Manual 1.2 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Traffic Control Plan - if applicable SD-03 Product Data Backflow Preventers SD-06 Test Reports Backflow Preventer Tests SD-07 Certificates Backflow Tester Certification Backflow Preventers Certificate of Full Approval 1.3 BACKFLOW PREVENTERS CERTIFICATE Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval.
This amendment should be acknowledged when your proposal is submitted.
Set-aside: Small Business Set Aside - Total
Camp Lejeune, NC, 28547, USA
Posted Sep 1, 2026; Responses due Sep 9, 2026, 7:00 PM UTC; Archive date Sep 24, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.