← Active opportunities
OpenCombined Synopsis/SolicitationAmended

MCAS Multiple Building Painting/Flooring Repairs

Solicitation numberN4008526R9069

DEPT OF DEFENSE · DEPT OF THE NAVY · NAVFACSYSCOM MID-ATLANTIC

View opportunity on SAM.gov ↗
Response deadlineSep 8, 2026, 6:00 PM UTC
Deadline status5 days remaining
PostedAug 14, 2026
Record refreshedSep 2, 2026
Place of performanceCamp Lejeune, NC, 28547, United States

Opportunity summary

Source-cited

This is a Small Business Set Aside opportunity for MCAS Multiple Building Painting/Flooring Repairs located at Camp Lejeune, NC. Proposals are due by September 8, 2026. [4]

Key points

  • Contractor must comply with special scheduling requirements. [2]
  • Submittals must include specific documentation like test reports. [3]

Watch items

  • Only M&R MACC Contractors may submit a proposal. [4]
  • Scope understanding is needed for eOMSI requirements. [1]

Sources

  1. Combined+DIV+01+SPECS.pdfThe purpose of this meeting is to reach a mutual understanding of the scope of work concerning the contract requirements for eOMSI and coordinate the efforts necessary by both the Government and Contractor to ensure an accurate collection, preparation and timely Government review of eOMSI.
  2. Combined+DIV+01+SPECS.pdfThe Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
  3. Combined+DIV+01+SPECS.pdfARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2014) Safety and Health Requirements Manual 1.2 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Traffic Control Plan - if applicable SD-03 Product Data Backflow Preventers SD-06 Test Reports Backflow Preventer Tests SD-07 Certificates Backflow Tester Certification Backflow Preventers Certificate of Full Approval 1.3 BACKFLOW PREVENTERS CERTIFICATE Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evalua
  4. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 5 sources

The purpose of this meeting is to reach a mutual understanding of the scope of work concerning the contract requirements for eOMSI and coordinate the efforts necessary by both the Government and Contractor to ensure an accurate collection, preparation and timely Government review of eOMSI.

Scope

The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.

Deliverables

Indicate in the report that for this definable feature of work, the drawings and specifications have been reviewed, submittals have been approved, materials comply with approved submittals, materials are stored properly, preliminary work was done correctly, the testing plan has been reviewed, and work methods and schedule have been discussed. c.

Evaluation

ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2014) Safety and Health Requirements Manual 1.2 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Traffic Control Plan - if applicable SD-03 Product Data Backflow Preventers SD-06 Test Reports Backflow Preventer Tests SD-07 Certificates Backflow Tester Certification Backflow Preventers Certificate of Full Approval 1.3 BACKFLOW PREVENTERS CERTIFICATE Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.

What changed

Aug 14, 2026 · 3 fields changed
Response deadline2026-08-31T18:00:00+00:002026-09-08T18:00:00+00:00
Archive date2026-09-152026-09-23
Documents3233

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑