← Active opportunities
OpenCombined Synopsis/SolicitationAmended

CHILLER REPLACEMENT BLDG.'S FC230, FC400, 58, 205, 213, 323, 914

Solicitation numberN4008526R9078

DEPT OF DEFENSE · DEPT OF THE NAVY · NAVFACSYSCOM MID-ATLANTIC

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 6:00 PM UTC
Deadline status6 days remaining
PostedAug 19, 2026
Record refreshedSep 2, 2026
Place of performanceCamp Lejeune, NC, 28547, United States

Opportunity summary

Source-cited

This is a Small Business Set Aside for chiller replacement at Camp Lejeune, NC, requiring the contractor to provide all necessary materials, labor, and supervision. The award basis is the lowest price proposal for this FY26/FY27 straddle project. [4][1][2]

Key points

  • Contractor must provide all materials, labor, equipment, and supervision. [1]
  • Basis for Award is the Lowest Price Proposal for a FY26/FY27 project. [2]

Watch items

  • Must coordinate site visits with PWD and review specifications. [1]
  • Offerors must submit Buy American statute requests to the Contracting Officer. [3]

Sources

  1. 26-0441+-+SOW+and+Drawings.pdfSCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: Detailed Requirements and Specifications: The contractor shall make site visits coordinated with PWD, Scotty Sholar-910-389-4418 Chiller Specifications and Basis of Design.
  2. RFP_26-0441.pdfBasis for Award: Lowest Price Proposal Acceptance Period: This is a FY26/FY27 straddle project.
  3. RFP_26-0441.pdfAn offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.
  4. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

The ROICC administers construction contracts and is the contractor’s first line of contact with the government. • Regulatory Requirements.

Scope

SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and supervision required to accomplish the following: Detailed Requirements and Specifications: The contractor shall make site visits coordinated with PWD, Scotty Sholar-910-389-4418 Chiller Specifications and Basis of Design.

Deliverables

Indicate in the report that for this definable feature of work, the drawings and specifications have been reviewed, submittals have been approved, materials comply with approved submittals, materials are stored properly, preliminary work was done correctly, the testing plan has been reviewed, and work methods and schedule have been discussed. c.

Evaluation

Basis for Award: Lowest Price Proposal Acceptance Period: This is a FY26/FY27 straddle project.

Submission

An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.

What changed

Aug 19, 2026 · 1 field changed
Documents79

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑