Scope
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVFACSYSCOM MID-ATLANTIC
This is a Small Business Set Aside for the replacement of water heaters and boilers at Camp Lejeune, NC. Proposals are due by September 8, 2026, and only Mechanical MACC Contractors listed on the General Requirements cover page may submit. [4]
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
Basis for Award: Lowest Price Proposal Acceptance Period: This is a FY26/FY27 straddle project.
An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The ROICC administers construction contracts and is the contractor’s first line of contact with the government. • Regulatory Requirements.
The Contractor shall comply with all special scheduling requirements as described in the attached project description. d.
Indicate in the report that for this definable feature of work, the drawings and specifications have been reviewed, submittals have been approved, materials comply with approved submittals, materials are stored properly, preliminary work was done correctly, the testing plan has been reviewed, and work methods and schedule have been discussed. c.
Basis for Award: Lowest Price Proposal Acceptance Period: This is a FY26/FY27 straddle project.
An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.
Set-aside: Small Business Set Aside - Total
Camp Lejeune, NC, 28547, USA
Posted Aug 25, 2026; Responses due Sep 8, 2026, 7:00 PM UTC; Archive date Sep 23, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.