Scope
The Contractor shall determine the monitoring and maintenance requirements in the Work Plan for the Government's and USFWS's approval or concurrence (AM003).
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVFACSYSCOM PACIFIC
This solicitation is for constructing an aircraft parking apron, taxiways, and related airfield support facilities at Andersen Air Force Base, Guam. The work requires determining monitoring and maintenance requirements for government and USFWS approval. [2][1]
The Contractor shall determine the monitoring and maintenance requirements in the Work Plan for the Government's and USFWS's approval or concurrence (AM003).
Place of performance: Yigo, GU, USA
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The Contractor shall determine the monitoring and maintenance requirements in the Work Plan for the Government's and USFWS's approval or concurrence.” Section 1.0 General 2nd Paragraph: Include “The Contractor and the qualified biologist shall prepare the detailed schedule for NR Mitigation upon the project award for the Government review and approval.” Section 5.1.5 Protect and Monitor ESA-Listed Species to be Remained Include “Monitor adverse effects to the monitored plants that are clearly attributed to construction activities (e.g., physical disturbance, dust accumulation, and sedimentation from run-off).
The Contractor shall determine the monitoring and maintenance requirements in the Work Plan for the Government's and USFWS's approval or concurrence (AM003).
T R A N S M I T T A L N O A C T I V I T Y N O S P E C S E C T DESCRIPTION ITEM SUBMITTED G O V T O R A / E R E V W R C L A S S I F I C A T I O N P A R A G R A P H # CONTRACTOR: SCHEDULE DATES CONTRACTOR ACTION APPROVING AUTHORITY A C T I O N C O D E DATE FWD TO APPR AUTH/ DATE OF ACTION DATE RCD FROM CONTR DATE FWD TO OTHER REVIEWER DATE RCD FROM OTH REVIEWER A C T I O N C O D E MAILED TO CONTR/ DATE OF ACTION DATE RCD FRM APPR AUTH REMARKS APPROVAL NEEDED BY MATERIAL NEEDED BY SUBMIT (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) 26 27 14.00 20 Completed Meter Installation 3.2.1 Schedule Completed Meter Data Schedule Meter Configuration Template Meter Configuration Report 3.2.1 2.1.1 3.2.1 SD-10 Operation and Maintenance G G G G Data Electricity Meters and Accessories 1.4.1 G SD-11 Closeout Submittals System Functional Verification 3.2.2 26 42 13
Cycas micronesica (fadang, faadang) 5-Year Review Summary and Evaluation.
SUBMITTAL REGISTER CONTRACTOR CONTRACT NO.
Yigo, GU, USA
Posted Aug 3, 2026; Responses due Oct 9, 2026, 12:00 AM UTC; Archive date Oct 23, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The project is to construct an aircraft parking apron with associated taxiways and shoulders, utility yards, airfield fence, and hydrant fueling pits and piping required to accommodate bombers, tankers, and other aircraft. Work should include all subgrade and subbase work, drainage, airfield lighting, grounding, mooring, markings, fencing, ramp area lighting, and other necessary airfield support.