Source-citedThis solicitation is for executive level office furniture for administrative offices in Naples, Italy, requiring design, placement, and installation services. The response deadline is September 14, 2026, and an update extended the site visit information submission deadline to August 31, 2026. [3]
Key points
- Contractor must provide design and installation drawings for furniture. [1]
- Deliverables include a schedule for removal, installation, and inspection. [2]
Watch items
- Site visit information must be submitted by August 31, 2026. [3]
- The solicitation is for office furniture in Naples, Italy. [3]
Sources
- 4.02+RFQ+-+N6817126QN072.pdf
Technical Requirements / Tasks: 3.1 Interior Design Requirements: The provide personnel Services-New Furniture Contractor shall all , equipment, transportation tools, materials, items necessary to design and placement of , supervision, supplies, other and services furniture planning contract. and services within the scope of this 3.2 The Contractor shall provide installation drawings for workstations and for standalone furniture, indicating designs and heights and widths.
- 4.02+RFQ+-+N6817126QN072.pdf
They shall provide a schedule of removal, installation and for final inspection.
- Official SAM.gov notice
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesThe current list of accepted unique item identifier types is maintained at . https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html (b) The Contractor shall deliver all items under a contract line, subline, or exhibit line item. (c) Unique item identifier. (1) The Contractor shall provide a unique item identifier for the following: (i) Delivered items for which the Government's unit acquisition cost is $5,000 or more, except for the following line items: Contract Line, Subline, or Exhibit Line Item Number Item Description ____ ____ ____ ____ ____ ____ (ii) Items for which the Government's unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table: Contract Line, Subline, or Exhibit Line Item Number Item Description ____ ____ ____ ____ ____ ____ (If items are identified in the Schedule, insert "See Schedule in this table.) (iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number . ____ (iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number . ____ (v) Any item not included in (i), (ii), (iii), or (iv) for which the contractor creates and marks a unique item identifier for traceability. (2) The unique item identifier assignment and its component data element combination shall not be duplicated on any other item marked or registered in the DoD Item Unique Identification Registry by the contractor. (3) The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology - International symbology specification - Data matrix; ECC200 data matrix specification. (4) The Contractor shall ensure that- Data syntax and semantics of unique item identifiers. (i) The data elements (except issuing agency code) of the unique item identifier are encoded within the data matrix symbol that is marked on the item using one of the following three types of data qualifiers, as determined by the Contractor: N6817126QN072 Page 25 of 39 (A) Application Identifiers (AIs) (Format Indicator 05 of ISO/IEC International Standard 15434), in accordance with ISO/IEC
Scope
Technical Requirements / Tasks: 3.1 Interior Design Requirements: The provide personnel Services-New Furniture Contractor shall all , equipment, transportation tools, materials, items necessary to design and placement of , supervision, supplies, other and services furniture planning contract. and services within the scope of this 3.2 The Contractor shall provide installation drawings for workstations and for standalone furniture, indicating designs and heights and widths.
Deliverables
They shall provide a schedule of removal, installation and for final inspection.
Evaluation
If the concern waives Waiver of evaluation preference the preference, the factor will be added to its offer for evaluation purposes.
Submission
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED REQUEST FOR QUOTE (RFQ) INVITATION FOR BID (IFB) REQUEST FOR PROPOSAL (RFP) SEE ADDENDUM 19.
Eligibility
Set-aside: No Set aside used
Place of performance
Naples, IT-72, ITA
Key dates
Posted Aug 27, 2026; Responses due Sep 14, 2026, 8:00 AM UTC; Archive date Sep 29, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.