Scope
This requirement SPRRA2-26-Q-0056/0003 is amended to extend the proposal due date to 9 September 2026 at 5:00 PM Central Standard time. (2).
DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION AT HUNTSVILLE, AL
This solicitation for a SWITCH ASSEMBLY is a Small Business Set Aside, with the proposal due date extended to September 9, 2026. Evaluation will use the Lowest Priced Technically Acceptable (LPTA) procedure if multiple proposals are received. [1][3]
This requirement SPRRA2-26-Q-0056/0003 is amended to extend the proposal due date to 9 September 2026 at 5:00 PM Central Standard time. (2).
Deviations from schedules cannot be approved without the completion and submission of this form.
In acquisitions in which more than one proposal is received, proposals will be evaluated using the Lowest Priced Technically Acceptable (LPTA) evaluation procedure to make a best value award decision.
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
SIMPLIFIED SOLICITATION FORM THIS SECTION OF THE FORM IS TO BE COMPLETED BY THE GOVERNMENT DATE: RFQ #: PRON #: Contract Specialist: Phone Number: Email Address: Contracting Officer: Phone Number: Email Address: THIS RFQ IS: Unrestricted Restricted Competition (FAR Part 6) Sole Source (FAR Part 6) Mandatory Source (FAR Part 8) EDWOSB WOSB TOTAL SBSA DESCRIPTION Noun: NSN: Part Number: FAT Qty: Production Qty: SERIALIZATION REQUIRED Yes [ ] No [ ] IUID REQUIRED Yes [ ] No [ ] DPAS Rating DO [ ] DX [ ] PACKAGING AND MARKING PACKAGING/PACKING/SPECIFICATIONS: MIL-STD-2073-1 & MIL-STD-129 MARKINGS SHALL APPLY UNIT PACK: ____ INTERMEDIATE PACK: ____ LEVEL PRESERVATION: __ LEVEL PACKING: _____ ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND SIZE (INCHES) Weight (WT) ______ Length (LN) ______ Width (WD) ______ Depth (DP) ______ ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15 COMPLIANT MIL-STD-2073-1 CODES, APPENDIX J JI/A/MP [ ] JII/CD [ ] JIII/PM [ ] JIV/WM [ ] JV/CD [ ] JVI/CT [ ] JVII/UC [ ] JVII/IC [ ] JIX/A/PK [ ] JX/SM [ ] JVIIIA/OPI [ ] Supplemental Packaging Instructions: _______________________________ TESTING REQUIREMENT Contractor First Article Test Government First Article Test Government Production Lot Test No Test Required SHIP TO: INSPECTION: ACCEPTANCE: FOB POINT: EXPORT CONTROLLED Yes [ ] No [ ] 08 JULY 2026 SPRRA2-26-Q-0056 D16H0987D1 Rodney Haygood 256-214-9748 rodney.haygood@dla.mil Thomas Gunter 256-562-9803 thomas.gunter@dla.mil SWITCH ASSEMBLY 5930-01-170-0931 11461080 0 4 1 Military B 2 8 6 4 Origin Destination Destination 000 41 1 00 ED 00 F EC 00 NA M A W31P0W SR W0H9 US ARMY AVN & MISSLES CMD REDSTONE TECHNICAL TEST CENTER COTTONWOOD RD BLDG 8022 NO SIMPLIFIED SOLICITATION FORM CONTINUED THIS SECTION OF THE FORM IS TO BE COMPLETED BY THE OFFEROR DATE: QUOTE #: QUOTE VALID FOR: Company Name: Cage Code/Facility Code: Address: Point of Contact: Phone Number: Email Address: QUOTE First Article Unit(s) (Contractor and Government) Quantity: Price: Production Lot Units Quantity: Price: Delivery Days (if applicable): FAT Unit: Production Unit: Test Report: ADDITIONAL NOTES
This requirement SPRRA2-26-Q-0056/0003 is amended to extend the proposal due date to 9 September 2026 at 5:00 PM Central Standard time. (2).
Deviations from schedules cannot be approved without the completion and submission of this form.
In acquisitions in which more than one proposal is received, proposals will be evaluated using the Lowest Priced Technically Acceptable (LPTA) evaluation procedure to make a best value award decision.
In these situations, the Government will award to the offeror which submits a technically acceptable proposal, with the lowest overall price.
Set-aside: Small Business Set Aside - Total
Fort Bliss, TX, 79916, USA
Posted Aug 31, 2026; Responses due Sep 9, 2026, 10:00 PM UTC; Archive date Oct 9, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
1). The purpose of this amendment 0002 for SPRRA2-26-Q-0056 is to Extend the Proposal due date to 09 Sept 2026 at 5:00pm Central Standard Time. 2). There are no other changes to the Term and Conditions
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.