Place of performanceEielson AFB, AK, 99702, United States
Opportunity summary
Public-source intelligence
Source-backed opportunity brief
5 citations · 1 source
The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.
What changed
Aug 25, 2026 · 2 fields changed
DescriptionThe objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description. ---------------------------------------------- 25 Aug 26, The purpose of this amendment is to inform the order of magnitude: $350,000- $500,000, and correct the issue date in the combo document.DocumentsNot previously reported16