Repair Fire Pump Controllers, B1176, HEF Disposal

Solicitation numberW50S6K-26-B-A001

DEPT OF DEFENSE · DEPT OF THE ARMY · W7MU USPFO ACTIVITY AKANG 168

View opportunity on SAM.gov ↗
Response deadlineSep 28, 2026, 6:00 PM UTC
Deadline status25 days remaining
PostedAug 25, 2026
Record refreshedAug 26, 2026
Place of performanceEielson AFB, AK, 99702, United States

Opportunity summary

Public-source intelligence

Source-backed opportunity brief

5 citations · 1 source

The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system.

Scope

Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.

What changed

Aug 25, 2026 · 2 fields changed
DescriptionThe objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description. ---------------------------------------------- 25 Aug 26, The purpose of this amendment is to inform the order of magnitude: $350,000- $500,000, and correct the issue date in the combo document.
DocumentsNot previously reported16