Place of performanceMcConnell AFB, KS, 67221, United States
Opportunity summary
Source-cited
The Department of Defense seeks a firm fixed price contract to remove and replace the geothermal heat pump in Building 40 at McConnell AFB, KS. This project is set aside partially for small businesses, with a 60-day performance period. [4]
Key points
Award will go to the lowest price responsible offeror meeting technical requirements. [2]
Offerors must submit only one quote with one approach. [3]
Watch items
Contractors must provide background check information for access. [1]
Sources
SOW+PRQE262949+B40+Heat+pump+replacement+(1).pdfThe contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services, or local Security Office.
Combined+Synopsis+Solicitation+B40+Heat+Pump.pdfEVALUATION FACTORS FOR AWARD The Government will award a contract resulting from this solicitation to the lowest price responsible offeror that meets the technical requirement.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sources
Contractors shall conform with all operational controls identified in the applicable agency of facility EMS and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS.
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services, or local Security Office.
COMBO (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
EVALUATION FACTORS FOR AWARD The Government will award a contract resulting from this solicitation to the lowest price responsible offeror that meets the technical requirement.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Update: 8/31/2026 - Updated RFIs and included Data Tag and Pictures of HPU Unit. Update: Included RFIs as of Augsut 24 2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete removal and replacment of Building 40 geothermal heat pump in accordance with the statement of work. Period of performance is 60 days from Notice to Proceed. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 27 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: 1. Combined Synopsis Solicitation 2. SOW B40 Heatpump replacement 3. W50S7X26Q00014 Provisions and Clauses 4. SCA Wage Determination 5. RFIs 6. HP-40-22 Existing Data Tag 7. HPU Unit in B40 pictures.
What changed
Aug 31, 2026 · 2 fields changed
DescriptionUpdate: Included RFIs as of Augsut 24 2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete removal and replacment of Building 40 geothermal heat pump in accordance with the statement of work. Period of performance is 60 days from Notice to Proceed. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 27 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: 1. Combined Synopsis Solicitation 2. SOW B40 Heatpump replacement 3. W50S7X26Q00014 Provisions and Clauses 4. SCA Wage Determination 5. RFIsUpdate: 8/31/2026 - Updated RFIs and included Data Tag and Pictures of HPU Unit. Update: Included RFIs as of Augsut 24 2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete removal and replacment of Building 40 geothermal heat pump in accordance with the statement of work. Period of performance is 60 days from Notice to Proceed. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 27 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: 1. Combined Synopsis Solicitation 2. SOW B40 Heatpump replacement 3. W50S7X26Q00014 Provisions and Clauses 4. SCA Wage Determination 5. RFIs 6. HP-40-22 Existing Data Tag 7. HPU Unit in B40 pictures.Documents57
Aug 24, 2026 · 2 fields changed
DescriptionThis is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete removal and replacment of Building 40 geothermal heat pump in accordance with the statement of work. Period of performance is 60 days from Notice to Proceed. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 27 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: 1. Combined Synopsis Solicitation 2. SOW B35 Chiller Replacement 3. W50S7X26Q00013 Provisions and Clauses 4. SCA Wage DeterminationUpdate: Included RFIs as of Augsut 24 2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete removal and replacment of Building 40 geothermal heat pump in accordance with the statement of work. Period of performance is 60 days from Notice to Proceed. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 27 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: 1. Combined Synopsis Solicitation 2. SOW B40 Heatpump replacement 3. W50S7X26Q00014 Provisions and Clauses 4. SCA Wage Determination 5. RFIsDocuments45