VGLZ 242009 Repair and Seal Floors in B825

Solicitation numberW50S8526BA004

DEPT OF DEFENSE · DEPT OF THE ARMY · W7NF USPFO ACTIVITY MIANG 127

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 4:00 PM UTC
Deadline status6 days remaining
PostedAug 24, 2026
Record refreshedSep 2, 2026
Place of performanceB825 Jefferson Ave. Selfridge ANGB, MI 48045, 48045

Opportunity summary

Source-cited

This solicitation is for repairing and sealing floors in building 825 at Selfridge ANGB, MI, requiring contractors to provide all necessary resources. The work must strictly comply with the SOW, project specifications, and drawings. [1][4]

Key points

  • Small Business Set Aside - Total [4]
  • Repair and seal floors in building 825 [3]

Watch items

  • Bids are due on September 9, 2026 [4]
  • Contractor must provide background check info [2]

Sources

  1. Solicitation+Amendment+-+W50S8526BA0040003.pdfContractor shall comply with all requirements, at no additional cost to the Government.
  2. Solicitation+Amendment+-+W50S8526BA0040003.pdfThe contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office.
  3. Solicitation+Amendment+-+W50S8526BA0040004.pdfREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) W50S8526BA0040004 Page 16 of 118 The Offeror shall submit the cost portion of the proposal via the following electronic media: ____ [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.] (End of provision) W50S8526BA0040004 Page 17 of 118 Section 00 22 13 - Supplementary Instructions to Bidders SITE VISIT: PROJECT: VGLZ242009 Repair and Seal Floors Bldg.
  4. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

Contractor shall comply with all requirements, at no additional cost to the Government.

Scope

The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office.

Deliverables

WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS as per Section 1.16 of the Division 01 Specifications entitled PROGRESS SCHEDULES, PROGRESS REPORTS, ANDPROGRESS MEETINGS 11.

Evaluation

The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record.

Submission

REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) W50S8526BA0040004 Page 16 of 118 The Offeror shall submit the cost portion of the proposal via the following electronic media: ____ [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.] (End of provision) W50S8526BA0040004 Page 17 of 118 Section 00 22 13 - Supplementary Instructions to Bidders SITE VISIT: PROJECT: VGLZ242009 Repair and Seal Floors Bldg.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides. This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT.

What changed

Aug 24, 2026 · 1 field changed
Documents8Removed
Aug 24, 2026 · 4 fields changed
Response deadline2026-08-26T16:00:00+00:002026-09-09T16:00:00+00:00
Archive date2027-08-212027-08-24
DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides. This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT.
Documents68
Aug 21, 2026 · 1 field changed
DocumentsNot previously reported6
Aug 21, 2026 · 3 fields changed
Archive date2027-07-282027-08-21
DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides.
Documents4Removed
Aug 10, 2026 · 4 fields changed
Response deadline2026-07-30T16:00:00+00:002026-08-26T16:00:00+00:00
Archive date2027-07-272027-07-28
DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit.
DocumentsNot previously reported4
Jul 27, 2026 · 2 fields changed
Archive date2027-07-162027-07-27
DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package.
Jul 16, 2026 · 2 fields changed
Archive date2027-07-072027-07-16
DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package.
Jul 7, 2026 · 3 fields changed
Notice typePresolicitationSolicitation
Response deadlineNot previously reported2026-07-30T16:00:00+00:00
Archive date2027-06-112027-07-07

Notice history

  • SolicitationPosted Aug 24, 2026 · response deadline Sep 9, 2026, 4:00 PM UTC
  • Solicitation · LatestPosted Aug 24, 2026 · response deadline Sep 9, 2026, 4:00 PM UTC
  • SolicitationPosted Aug 21, 2026 · response deadline Aug 26, 2026, 4:00 PM UTC
  • SolicitationPosted Aug 21, 2026 · response deadline Aug 26, 2026, 4:00 PM UTC
  • SolicitationPosted Aug 10, 2026 · response deadline Aug 26, 2026, 4:00 PM UTC
  • SolicitationPosted Jul 27, 2026 · response deadline Jul 30, 2026, 4:00 PM UTC
  • SolicitationPosted Jul 16, 2026 · response deadline Jul 30, 2026, 4:00 PM UTC
  • SolicitationPosted Jul 7, 2026 · response deadline Jul 30, 2026, 4:00 PM UTC
  • PresolicitationPosted Jun 11, 2026 · response deadline Deadline not provided

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑