Place of performanceB825 Jefferson Ave. Selfridge ANGB, MI 48045, 48045
Opportunity summary
Source-cited
This solicitation is for repairing and sealing floors in building 825 at Selfridge ANGB, MI, requiring contractors to provide all necessary resources. The work must strictly comply with the SOW, project specifications, and drawings. [1][4]
Solicitation+Amendment+-+W50S8526BA0040003.pdfThe contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office.
Solicitation+Amendment+-+W50S8526BA0040004.pdfREQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) W50S8526BA0040004 Page 16 of 118 The Offeror shall submit the cost portion of the proposal via the following electronic media: ____ [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.] (End of provision) W50S8526BA0040004 Page 17 of 118 Section 00 22 13 - Supplementary Instructions to Bidders SITE VISIT: PROJECT: VGLZ242009 Repair and Seal Floors Bldg.
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation's Security Forces, Director of Emergency Services or local Security Office.
WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS as per Section 1.16 of the Division 01 Specifications entitled PROGRESS SCHEDULES, PROGRESS REPORTS, ANDPROGRESS MEETINGS 11.
The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record.
REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) W50S8526BA0040004 Page 16 of 118 The Offeror shall submit the cost portion of the proposal via the following electronic media: ____ [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.] (End of provision) W50S8526BA0040004 Page 17 of 118 Section 00 22 13 - Supplementary Instructions to Bidders SITE VISIT: PROJECT: VGLZ242009 Repair and Seal Floors Bldg.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides. This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT.
What changed
Aug 24, 2026 · 1 field changed
Documents8Removed
Aug 24, 2026 · 4 fields changed
Response deadline2026-08-26T16:00:00+00:002026-09-09T16:00:00+00:00Archive date2027-08-212027-08-24DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides. This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT.Documents68
Aug 21, 2026 · 1 field changed
DocumentsNot previously reported6
Aug 21, 2026 · 3 fields changed
Archive date2027-07-282027-08-21DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides.Documents4Removed
Aug 10, 2026 · 4 fields changed
Response deadline2026-07-30T16:00:00+00:002026-08-26T16:00:00+00:00Archive date2027-07-272027-07-28DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT. Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT. This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit.DocumentsNot previously reported4
Jul 27, 2026 · 2 fields changed
Archive date2027-07-162027-07-27DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package.
Jul 16, 2026 · 2 fields changed
Archive date2027-07-072027-07-16DescriptionThe work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply. All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825. Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error. REMINDER: Acknowledge all amendments in your Bid Package.