Place of performanceRock Island, IL, 61299, United States
Opportunity summary
Source-cited
The Department of Defense is soliciting proposals for the Repair of Driveways and Sidewalks at Quarters 1 on the Rock Island Arsenal in Rock Island, Illinois. Proposals must include a high-level plan demonstrating feasibility within a 120-day timeframe. [4][3]
Key points
Contractor must provide all necessary services, labor, and materials for the work. [1]
Proposals require a one-page chart showing major project phases and dates. [3]
Evaluation is based on the most advantageous overall solution. [2]
Sources
Attachment+0001_2026-0215_Statement+of+Work+(SOW)_07JUL2026.pdfProject # 2026-0215 Repair Quarters 1 – Driveways and Sidewalks 5 | P a g e 1.2 SPECIAL SERVICES/REQUIREMENTS 1.2.1 The contractor shall provide all services, labor, materials, supervision, equipment, tools, etc. necessary to accomplish the work described in this SOW.
Solicitation_W519TC26RA071_Quarters+1+Repair+(27AUG26).pdf(End of provision) W519TC26RA071 Page 60 of 62 Section M - Evaluation Factors for Award Section M: Addendum to FAR 52.212-2 (Evaluation) EVALUATION AND BASIS FOR AWARD The Government will award a contract resulting from this solicitation to the responsible offeror whose offer represents the most advantageous overall solution to the Government.
Solicitation_W519TC26RA071_Quarters+1+Repair+(27AUG26).pdfW519TC26RA071 Page 55 of 62 W519TC26RA071 Page 56 of 62 Section L - Instructions, Conditions, & Notices to Offerors or Quoters Section L: Addendum to FAR 52.212-1 (Instructions to Offerors) PROPOSAL SUBMISSION INSTRUCTIONS Offerors shall submit their proposals to include the following information: Schedule and Key Personnel must include: A high-level, one-page chart or list outlining the major project phases and their estimated start and end dates (e.g., Mobilization, Demolition & Grading, Storm Sewer Installation, Paving, Electrical Work, Surface Restoration, Demobilization) to demonstrate a feasible plan for completion within the 120-day timeframe.
Project # 2026-0215 Repair Quarters 1 – Driveways and Sidewalks 5 | P a g e 1.2 SPECIAL SERVICES/REQUIREMENTS 1.2.1 The contractor shall provide all services, labor, materials, supervision, equipment, tools, etc. necessary to accomplish the work described in this SOW.
NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 6 | NaN | PRECON SUBMTL | Submittal Register | 1.2.1 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 7 | NaN | PRECON SUBMTL | Schedule of Values | 1.2.1 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 8 | NaN | PRECON SUBMTL | Environmental Protection Plan | 1.2.1 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 01 35 26 - GOVERNMENT SAFTEY REQUIREMENTS | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 1 | NaN | PRECON SUBMTL | Accident Prevention Plan (APP) | 1.6 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 2 | NaN | TEST REPORTS | Notifications and Reports | 1.11 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 3 | NaN | TEST REPORTS | Accident Reports | 1.11.2 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 4 | NaN | TEST REPORTS | LHE Inspection Reports | 1.11.3 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 5 | NaN | CERTIFICATES | Crane Operators/Riggers | 1.5.1.3 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 6 | NaN | CERTIFICATES | Standard Lift Plan | 1.6.3.1 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 7 | NaN | CERTIFICATES | Activity Hazard Analysis (AHA) | 1.7 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 8 | NaN | CERTIFICATES | Hot Work Permit | 1.8.1 | | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 9 | NaN | CERTIFICATES | Certificate of Compliance | 1.11.4 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 10 | NaN | PRECON SUBMTL | Emergency Plan | SOW-3.2.3.C | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 01 45 00.00 10 - QUALITY CONTROL | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | | 1 | NaN | PRECON SUBMTL | Contractor Quality Control (CQC) Plan | 1.6 | G | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN | NaN |
(End of provision) W519TC26RA071 Page 60 of 62 Section M - Evaluation Factors for Award Section M: Addendum to FAR 52.212-2 (Evaluation) EVALUATION AND BASIS FOR AWARD The Government will award a contract resulting from this solicitation to the responsible offeror whose offer represents the most advantageous overall solution to the Government.
W519TC26RA071 Page 55 of 62 W519TC26RA071 Page 56 of 62 Section L - Instructions, Conditions, & Notices to Offerors or Quoters Section L: Addendum to FAR 52.212-1 (Instructions to Offerors) PROPOSAL SUBMISSION INSTRUCTIONS Offerors shall submit their proposals to include the following information: Schedule and Key Personnel must include: A high-level, one-page chart or list outlining the major project phases and their estimated start and end dates (e.g., Mobilization, Demolition & Grading, Storm Sewer Installation, Paving, Electrical Work, Surface Restoration, Demobilization) to demonstrate a feasible plan for completion within the 120-day timeframe.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
The Army Contracting Command - Rock Island (ACC-RIA) requests a proposal for the Repair of Driveways and Sidewalks of Quaters 1 located on the Rock Island Arsenal, Rock Island, Illinois. See attachments for details. Amendment 0001_Update NAICS Code on Page 52 per FAR Clause 52.219-1 (01SEP)
What changed
Sep 1, 2026 · 3 fields changed
TitleRepair Quarters 1 - Driveways and SidewalksRepair Quarters 1 - Driveways and Sidewalks (Amendment 0001)DescriptionThe Army Contracting Command - Rock Island (ACC-RIA) requests a proposal for the Repair of Driveways and Sidewalks of Quaters 1 located on the Rock Island Arsenal, Rock Island, Illinois. See attachments for details.The Army Contracting Command - Rock Island (ACC-RIA) requests a proposal for the Repair of Driveways and Sidewalks of Quaters 1 located on the Rock Island Arsenal, Rock Island, Illinois. See attachments for details. Amendment 0001_Update NAICS Code on Page 52 per FAR Clause 52.219-1 (01SEP)Documents78