Scope
The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation.
DEPT OF DEFENSE · DEPT OF THE ARMY · 0906 AQ CO CONTRACTING BAT
The Department of Defense anticipates issuing a solicitation for purchasing, installing, and integrating DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems at Osan Air Base, ROK. The scope includes demolition, site work, and complex PLC reprogramming for synchronized ACP operation. [1]
The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK).
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK).
The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation.
96278
Posted Aug 31, 2026; Responses due Oct 1, 2026, 4:00 AM UTC; Archive date Sep 1, 2027
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation.
No attachments are currently listed.