Response deadlineSep 22, 2026, 3:00 PM UTC
Deadline status19 days remaining
PostedAug 26, 2026
Record refreshedSep 2, 2026
Place of performanceUnited States
Opportunity summary
Source-citedThe Department of Defense seeks a supply with installation for the VERTIV NetSure DC Power System at the White Sands Missile Range Information Systems Facility. This is a Small Business Set Aside, with responses due by September 22, 2026. [4][1]
Key points
- System is a modular, scalable -48 VDC power system. [1]
- Contractor employees need background checks for site access. [2]
Watch items
- Confirm required factory and onsite acceptance testing. [1]
- Determine if VERTIV authorization is required for technicians. [3]
Sources
- MICC+Questions+DC+Power+V2.docx
Site visit: Will the Government conduct a site visit or permit prospective contractors to inspect the installation location before submitting quotations?
- SOW+SPECS+MUE+ISF+DC+Power+Plant+2nd+Buy+V2.docx
Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
- MICC+Questions+DC+Power+V2.docx
VERTIV authorization: Must the contractor and installation technicians be VERTIV-authorized or factory-certified?
- Official SAM.gov notice
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 5 sourcesSite visit: Will the Government conduct a site visit or permit prospective contractors to inspect the installation location before submitting quotations?
Scope
Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Deliverables
Testing and training: Please confirm the required factory testing, onsite acceptance testing, commissioning reports, operator training, warranty documentation, as-built drawings, and other closeout deliverables.
Evaluation
VERTIV authorization: Must the contractor and installation technicians be VERTIV-authorized or factory-certified?
Submission
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED REQUEST FOR QUOTE (RFQ) INVITATION FOR BID (IFB) REQUEST FOR PROPOSAL (RFP) SEE ADDENDUM 19.
Eligibility
Set-aside: Small Business Set Aside - Total
Place of performance
USA
Key dates
Posted Aug 26, 2026; Responses due Sep 22, 2026, 3:00 PM UTC; Archive date Oct 7, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.