← Active opportunities
OpenSolicitationAmended

ACC002 Utilities and Infrastructure

Solicitation numberW911KB26RWP01

DEPT OF DEFENSE · DEPT OF THE ARMY · W2SN ENDIST ALASKA

View opportunity on SAM.gov ↗
Response deadlineSep 9, 2026, 10:00 PM UTC
Deadline status6 days remaining
PostedAug 31, 2026
Record refreshedSep 1, 2026

Opportunity summary

Source-cited

The US Army Corps of Engineers requires Preconstruction Services and construction for the Fighter Town Recapitalization at JBER Alaska, utilizing an Other Transaction OT Agreement. This project involves preparing a 500+ acre site and establishing critical civil and airfield infrastructure. [1]

Key points

  • Phase 1 involves assisting with scope, budget, and schedule coordination. [1]
  • Construction execution follows GMP acceptance after design reaches 65-95%. [1]

Watch items

  • Response deadline is September 9, 2026. [1]
  • Work must be highly sequenced due to complex topography. [1]

Sources

  1. Official SAM.gov noticePhase 1 Pre Construction Services The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the projects scope constructability budget quality schedule and in coordination with the Designer of Record DOR.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

4 citations · 1 source

Phase 1 Pre Construction Services The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the projects scope constructability budget quality schedule and in coordination with the Designer of Record DOR.

Scope

The US Army Corps of Engineers USACE Alaska District has a requirement for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson JBER Alaska.

Deliverables

Due to complex topography and concurrent MILCON construction schedules the work must be highly sequenced to ensure uninterrupted operational capabilities and facilitate staggered facility occupancy dates.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The US Army Corps of Engineers USACE Alaska District has a requirement for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson JBER Alaska. This project executes Phase I of a multi phase recapitalization program to prepare a 500 plus acre site and establish the critical civil utility and airfield infrastructure. Due to complex topography and concurrent MILCON construction schedules the work must be highly sequenced to ensure uninterrupted operational capabilities and facilitate staggered facility occupancy dates. Utilizing an Other Transaction OT Agreement under the authority of 10 USC 2808a Facility Construction or Repair Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 USC 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience improved installation support or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk CMAR. Phase 1 Pre Construction Services The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the projects scope constructability budget quality schedule and in coordination with the Designer of Record DOR. Phase 2 Construction Upon reaching an agreed upon level of design such as 65 percent to 95 percent the Awardee will propose a Guaranteed Maximum Price GMP. If the GMP is accepted the Government will exercise construction execution. If a GMP cannot be agreed upon the Government retains an off ramp to complete the construction of the facility via alternative methods.

What changed

Aug 31, 2026 · 1 field changed
Archive date2027-08-272027-08-31
Aug 27, 2026 · 1 field changed
Archive date2027-08-122027-08-27
Aug 12, 2026 · 1 field changed
Response deadline2026-08-26T22:00:00+00:002026-09-09T22:00:00+00:00
Aug 12, 2026 · 1 field changed
Archive date2027-08-072027-08-12

Notice history

  • Solicitation · LatestPosted Aug 31, 2026 · response deadline Sep 9, 2026, 10:00 PM UTC
  • SolicitationPosted Aug 27, 2026 · response deadline Sep 9, 2026, 10:00 PM UTC
  • SolicitationPosted Aug 12, 2026 · response deadline Sep 9, 2026, 10:00 PM UTC
  • SolicitationPosted Aug 12, 2026 · response deadline Aug 26, 2026, 10:00 PM UTC
  • SolicitationPosted Aug 7, 2026 · response deadline Aug 26, 2026, 10:00 PM UTC

Attachments

No attachments are currently listed.

Back to top ↑