Place of performanceGranger Lake Office, 3100 Granger Dam Road, Granger, TX 76530-5067, 76530

Opportunity summary

Source-cited

This solicitation is for the erection of a Government-furnished pre-engineered steel building in Granger Lake, Texas, with offers due by September 14, 2026. The work requires furnishing labor, equipment, and supervision, and involves pre-erection inspections of the foundation. [1]

Key points

  • Small Business Set Aside - Total [1]
  • Contractor must examine foundation prior to erection [1]

Watch items

  • Response deadline is September 14, 2026 [1]
  • Materials not listed in SOW Attachment 1 need COR approval [1]

Sources

  1. Official SAM.gov noticeOFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

6 citations · 1 source

OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS.

Scope

Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

Submission

Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract.

What changed

Aug 28, 2026 · 5 fields changed
Notice typePresolicitationSolicitation
Response deadlineNot previously reported2026-09-14T16:00:00+00:00
Archive date2027-08-142027-08-28
NAICS332311236220
DescriptionSUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. PROPOSED SOLICITATION NUMBER: W9126G26QA113; POSTED ON OR ABOUT 20 AUGUST 2026. SOLICITATION CLOSING DATE: 10 SEPTEMBER 2026. DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract.SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract.

Notice history

Attachments

No attachments are currently listed.

Back to top ↑