← Active opportunities
OpenSolicitation

Navarro Mills Shelter Top Repairs

Solicitation numberW9126G26RA111

DEPT OF DEFENSE · DEPT OF THE ARMY · W076 ENDIST FT WORTH

View opportunity on SAM.gov ↗
Response deadlineSep 20, 2026, 4:00 PM UTC
Deadline status17 days remaining
PostedAug 28, 2026
Record refreshedAug 29, 2026
Place of performanceU.S. Army Corps of EngineersNavarro Mills Lake Office1175 FM 667Purdon, Texas, 76679

Opportunity summary

Source-cited

This solicitation requires providing labor, tools, equipment, and materials for various shelter top and beam replacements at Oak Park and Liberty Hill Park. The work is a Small Business Set Aside and is located in Purdon, Texas. [1]

Key points

  • Replace wooden shelter tops with metal at multiple locations. [1]
  • Small Business Set Aside - Total for this opportunity. [1]

Watch items

  • Response deadline is September 20, 2026. [1]
  • Performance location is in Purdon, Texas. [1]

Sources

  1. Official SAM.gov noticeInitially Synopsized under RFP No.W9126G26RA110 posted on or about 5 August 2026.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

4 citations · 1 source

Initially Synopsized under RFP No.W9126G26RA110 posted on or about 5 August 2026.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Initially Synopsized under RFP No.W9126G26RA110 posted on or about 5 August 2026. Solicitation Closing Date of 20 September 2026. Provide all labor tools equipment and material to replace nine (9) wooden shelter tops and beams with metal at Oak Park. Provide all labor tools equipment and material to replace twenty (20) wooden shelter tops with existingmetal truss at Oak Park. Provide all labor tools equipment and material to replace nine (9) wooden shelter tops with metal at Liberty Hill Park. Provide all labor tools equipment and material to replace three (3) wooden shelter tops with metal at Liberty Hill Park.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

No attachments are currently listed.

Back to top ↑