Scope
1.25 Scope of Services (SOS) refers to a Government-provided document outlining the tasks, requirements, and deliverables for specific phases of the project.
DEPT OF DEFENSE · DEPT OF THE ARMY · W076 ENDIST FT WORTH
The Department of Defense seeks a Design-Build team for a Multi-Domain Cyber & Intel Operations Center at JBSA Lackland AFB, Texas. The acquisition will use a Progressive Design-Build model via an Other Transaction Agreement, requiring a White Paper submission. [3][1]
3.3.7.2 Responsible Party Coding (RESP) Assign responsibility code for all activities to the Design-Builder, Subcontractor(s) or Government agency(ies) responsible for performing the activity. a.
Please refer to Attachment 1 and Evaluation Criteria.
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
3.3.7.2 Responsible Party Coding (RESP) Assign responsibility code for all activities to the Design-Builder, Subcontractor(s) or Government agency(ies) responsible for performing the activity. a.
1.25 Scope of Services (SOS) refers to a Government-provided document outlining the tasks, requirements, and deliverables for specific phases of the project.
OTA Specifications DRAFT DRAFT schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and agreement close-out.
Please refer to Attachment 1 and Evaluation Criteria.
Resubmit the submittal register and annotate it monthly with actual submission and approval dates.
Set-aside: No Set aside used
JBSA Lackland, TX, 78236, USA
Posted Aug 26, 2026; Responses due Sep 25, 2026, 7:00 PM UTC; Archive date Oct 10, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this solicitation announcement to identify a Design-Build (DB) team for a new Multi-Domain Cyber & Intel Operations Center (MDCIOC) at Joint Base San Antonio (JBSA), Lackland AFB, Texas. The proposed project involves the design and construction of an approximately 600,000-square-foot, multi-story facility to consolidate the 16th Air Force's Information Warfare workforce. The new center will be a state-of-the-art, 24/7 facility designed to the highest security and technical standards, including ICD 705. The project will house over 3,000 personnel and support global cyberspace operations, intelligence, surveillance, and reconnaissance (ISR). The project delivery model will be a Progressive Design-Build (PDB) executed through an Other Transaction (OT) Agreement. The acquisition will be conducted in two phases: Phase 1: Design and Pre-Construction Services: The selected DB team will collaborate with the Government to advance the design and refine project requirements. Phase 2: Full Design and Construction: Upon successful negotiation of a fair and reasonable price, the OT may be modified to include the final design and construction. The Government will use a two-step, qualifications-based selection process: White Paper Submission & Evaluation. Pitch Meetings (by invitation only). Request for White Papers: Interested parties are invited to submit a White Paper in accordance with this announcement and its attachments. The White Paper is the only submission required at this time and must address all requirements outlined in Attachment 1 of the solicitation to be considered. Submissions should demonstrate the respondent's qualifications, project understanding, and relevant experience. Questions Due Date: All questions must be submitted via the ProjNet Bidder Inquiry System by September 18, 2026, in accordance with the instructions in the solicitation. White Paper Due Date: White Papers must be submitted via email to the Solicitation POCs no later than 2:00 PM CT on September 25, 2026. Email Subject Line: "White Paper for Multi Domain Cyber & Intel Operations Center" Please refer to the attached solicitation document and Attachments for complete details on the project scope, submission requirements, and evaluation criteria.
No field-level changes were detected between related notices.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.