Scope
The Contractor shall also provide all information required installation access requirements to be accomplished by installation for background checks to meet Provost Marshal Office, Director of Emergency Services or Security Office.
DEPT OF DEFENSE · DEPT OF THE ARMY · W071 ENDIST KANSAS CITY
The U.S. Army Corps of Engineers needs refuse collection and disposal services at the Stockton Lake Project in Stockton, MO. Offers must be submitted electronically by November 10, 2026, and must be good for 90 days. [4]
The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Technical Exhibit – Deliverables Schedule 7.3.
SECTION L - QUOTATION INSTRUCTIONS Instruction to Offers Addendum: The offeror's Quote shall be submitted as an electronic copy to and .
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
The Contractor shall also provide all information required installation access requirements to be accomplished by installation for background checks to meet Provost Marshal Office, Director of Emergency Services or Security Office.
Technical Exhibit – Deliverables Schedule 7.3.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
SECTION L - QUOTATION INSTRUCTIONS Instruction to Offers Addendum: The offeror's Quote shall be submitted as an electronic copy to and .
Set-aside: No Set aside used
Stockton, MO, 65785, USA
Posted Oct 27, 2025; Responses due Nov 10, 2026, 6:00 PM UTC; Archive date Nov 25, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The U.S. Army Corps of Engineers Kansas City District, Operations Division, has a need for refuse collection services at Stockton Lake Project, Stockton, MO. The contractor shall perform all services in accordance with the Performance Work Statement (PWS). The Contractor shall furnish all personnel, equipment, dumpsters, fuel, transportation, permits and materials necessary to remove and properly dispose of refuse from parks and recreation areas, administrative area, and the powerhouse at the Stockton Lake Project and provide roll off services in accordance with the PWS. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, quotes are being requested. Offers are due on at the time and date specified in box 8 of the solicitation document. Offers shall be submitted in PDF via e-mail to angella.curran@usace.army.mil and CC christopher.w.anderson@usace.army.mil. All offers must be good for 90 days. SITE VISIT Contact POC Patricia Burns at Stockton Lake Project to schedule a site visit. Patricia.A.Burns@usace.army.mil (816) 389-3005 X 3005 The offeror's Quote shall be submitted as an electronic copy to angella.curran@usace.army.mil and christopher.w.anderson@usace.army.mil. The Quote should be submitted on the attached synopsis/solicitation in pdf (Adobe Acrobat) format. All text must be legible and easily read. The Quote shall not exceed 10MB in size. If you have any issues in submitting your proposal electronically, coordinate with Ms. Angella Curran immediately at (816) 389-3816. The due date for the receipt of proposals is listed in Block 8 of the SF 1449. The final date to submit questions is five (5) days prior to the due date of the synopsis/solicitation. Please read the following submission requirements carefully. The offeror's quote shall include the following elements to be considered for award: SF 1449 - Filled out by the offeror for: . Block 17a . Block 17b (if applicable) . Block 30a . Block 30b . Block 30c . Section B - Continuation of Supplies or Services and Prices/Costs - To include the price for all Contract Line-Item Numbers (CLINs). FAR 52.212-3. If the offeror's System for Award Management (SAM) Representations and Certifications are upto- date, then this separate provision is not required to be filled out. FAR Provision 52.204-24 must be completed to be eligible for award. . Section J - Vendor Information Sheet . Section J - Related Experience Form/Submit a maximum of 3. . Section J - Past Performance Form/Submit a maximum of 3. (End of Instruction to Offers Addendum)
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.