Scope
Attachment 10: Appendix 13 - Did FRR-21-001 Rev 00 Workplan Outline Requirements.
DEPT OF DEFENSE · DEPT OF THE ARMY · W2V6 USA ENG SPT CTR HUNTSVIL
This is an amendment to Solicitation W912DY26RA136 for the FY26 Luke AFB Dorm Building 635 Renovation, extending the proposal due date to September 8, 2026. The amendment incorporates several updated documents, including revised specifications and a change in the building number from B3620 to B635. [1]
Incorporate Amendment following documents:4Government Response to Projnet Questions.
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Incorporate Amendment following documents:4Government Response to Projnet Questions.
Attachment 10: Appendix 13 - Did FRR-21-001 Rev 00 Workplan Outline Requirements.
Attachment 8: Appendix 11 - Luke AFB B635 Environmental Report.
Attachment 11: Appendix 14 - Exterior Wall Section-3dAttachment 14: DBA AZ20260039 Mod 1 dated 18 May 2026 Attachment 15: Submittal Register Attachment 16: PA Map 22All other terms and conditions of the original solicitation remain unchanged.
Posted Aug 28, 2026; Responses due Sep 8, 2026, 8:00 PM UTC; Archive date Aug 28, 2027
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The purpose of this Amendment to Solicitation W912DY26RA136 (FY26 Luke AFB Dorm Building 635 Renovation) is to incorporate the following changes: Extend the proposal due date from 31 August 2026 to 08 September 2026 a 2PM CDT.2) Updated CLIN 0001 building number from B3620 to B635. Changed FAR Clause 52.211-12, Liquidated Damages- Construction amounts. Incorporate Amendment following documents:4Government Response to Projnet Questions. Attachment 1: Sow Revision date 27 August 20266) Attachment 12: Amended Div 01 Specifications. Attachment 17: Appendix 15 B635 to B465 Fiber Path HH-634Incorporate the original solicitation documents: Attachment 2: Appendix 3 - Existing Controls Protocol (Provided For Reference Only)Attachment 3: Appendix 4-6 Safety Requirements (No Dual Hatting)Attachment 4: Appendix 7 - Bldg. 635 Photos. Attachment 5: Appendix 8 - Bldg. 635 Cadd Drawings (Provided For Reference Only) (Note: uploaded via DOD Safe)Attachment 6: Appendix 9 - Minimum Qualifications1Attachment 7: Appendix 10 - Luke AFB B635 Fire Hydrant Flow Test. Attachment 8: Appendix 11 - Luke AFB B635 Environmental Report. Attachment 9: Appendix 12 - Design Standards and Codes. Attachment 10: Appendix 13 - Did FRR-21-001 Rev 00 Workplan Outline Requirements. Attachment 11: Appendix 14 - Exterior Wall Section-3dAttachment 14: DBA AZ20260039 Mod 1 dated 18 May 2026 Attachment 15: Submittal Register Attachment 16: PA Map 22All other terms and conditions of the original solicitation remain unchanged.
No attachments are currently listed.