FY28 Frequency Converter Plant, Yokohama North Dock

Solicitation numberW912HV-26-Z-0022

DEPT OF DEFENSE · DEPT OF THE ARMY · W2SN ENDIST JAPAN

View opportunity on SAM.gov ↗
Response deadlineSep 16, 2026, 7:00 AM UTC
Deadline status12 days remaining
PostedAug 26, 2026
Record refreshedSep 2, 2026
Place of performanceJPN

Opportunity summary

Source-cited

The Department of Defense is seeking local industry interest for the FY28 Frequency Converter Plant in Yokohama North Dock, exploring Progressive Design Build and Integrated Design and Construction methods. This market survey is intended only for local sources physically located and licensed to conduct business in Japan. [1]

Key points

  • Project involves constructing a 66kV electrical substation and frequency converter plant. [1]
  • The acquisition explores PDB and IDAC strategies for collaborative design. [1]

Watch items

  • Local sources must possess specific Japanese construction licenses. [1]
  • The project magnitude is between ¥7.5B and ¥15B Japanese YEN. [1]

Sources

  1. Official SAM.gov noticeGovernment and the Contractor work together as a team to collaboratively/progressively develop the design, schedule, and cost.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

7 citations · 3 sources

This means transparently sharing subcontractor quotes, material costs, and overhead calculations with the Government as the design develops. * Reduced Bidding Risk: Because the Contractor is selected based on qualifications rather than a firm bid price, the Contractor does not have to assume the high financial risk of estimating construction costs on incomplete conceptual drawings. * Fast-Tracking (Early Work Packages): PDB allows the Government to award specific construction tasks (such as site clearing, foundation work, or ordering long-lead electrical equipment) before the 100% final design is finished, accelerating the overall project schedule. * The "Off-Ramp" Provision: If the Government and the Contractor cannot agree on a fair construction price at the end of Phase 1, the Government may exercise an "off-ramp." The Contractor will be fully paid for their Phase 1 design services, the contract will be closed, and the Government will bid the remaining construction work to the open market.

Scope

The Contractor provides real-time cost estimating, identifies long-lead materials (e.g., transformers), and ensures constructability. | The Contractor is paid a fixed fee or negotiated rate for these Phase 1 design and consulting services. | Phase 1 is to progress the design to a level of maturity (60%-90% completion) where a highly accurate, fair and reasonable construction cost can be established. | | **Phase 2: Construction Execution** | Once the design reaches an agreed-upon milestone (usually 60% to 90% complete), the Contractor submits a final proposal to construct the facility based on the design they helped create. | Executed as a Firm-Fixed-Price (FFP) or Guaranteed Maximum Price (GMP) agreed upon by both parties. | Following price acceptance, the existing contract is modified to include the construction contract scope and cost. |

Deliverables

Government and the Contractor work together as a team to collaboratively/progressively develop the design, schedule, and cost.

Submission

Firms interested and capable of performing this work are highly encouraged to submit a response (submission requirements are located within this notice).

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

See attachment for full Market Questionnaire. The U.S. Army Corps of Engineers (USACE) is exploring the use of alternative acquisition strategies like Progressive Design Build and Integrated Design and Construction for the upcoming electrical substation project at Yokohama North Dock. Because these contracting method differ from traditional U.S. Government Fixed-Price Design-Build contracts, this summary is provided to explain the different framework, how risks are shared, and how the contractor and Government will collaborate as well as to determine local industry interest in these new methods. What is Progressive Design-Build (PDB)? PDB is a highly collaborative project delivery method. Unlike traditional Design-Build where contractors must submit a final construction proposal based on an incomplete preliminary design, PDB selects a contractor based primarily on their qualifications, past performance, and expertise, rather than a final price. What is Integrated Design & Construction (IDAC)? The Integrated Design and Construction (IDAC) acquisition strategy represents a highly collaborative, two-phase procurement method designed to mitigate risks, compress timelines, and control costs on complex military and civil works construction projects. The intent is to competitively select the construction contractor early in the design cycle. This allows the construction contractor to provide real-time constructability reviews, cost estimations, and market supply-chain analysis while the Designer of Record (DOR) finalizes the design. For both methods, once the contractor is selected, the U.S. Government and the Contractor work together as a team to collaboratively/progressively develop the design, schedule, and cost. This market survey is intended for local sources only. Local sources are those sources physically located and licensed to conduct business in Japan. Firms interested and capable of performing this work are highly encouraged to submit a response (submission requirements are located within this notice). We are committed to partnering with industry as much as we can throughout this process and therefore encourage all interested companies to respond to this sources sought. Market research and industry feedback is an essential part of the acquisition process. The information requested in this announcement will be used within POJ to facilitate decision-making and will not be disclosed outside the agency. However, respondents submitting business information pursuant to this announcement should consult 41 C.F.R. parts 105-60 and other implementing regulations concerning the release of such information to third parties under the Freedom of Information Act (FOIA). All information submitted by respondents that they consider confidential and not releasable to third parties outside of USACE, and its employees, agents, consultants, and representatives, must be clearly and conspicuously marked. SYSTEM FOR AWARD MANAGEMENT (SAM) All interested companies, including joint ventures, shall be registered in the SAM database in order to be eligible for award of Government contracts. https://www.sam.gov LOCAL SOURCES Firms which have not done business with U.S. Army Corps of Engineers, Japan Engineering District, are requested to visit the following website: https://www.poj.usace.army.mil/Business-With-Us/ for general information. a. This contract will be performed in its entirety in the country of Japan and is intended only for local sources. Only local sources will be considered under this solicitation. Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan. Specifically, a prospective offeror must be duly authorized to operate and conduct construction business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts. b. In addition, offerors must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the proposal due date and time. The U.S. Government will verify that the offeror has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the offeror to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the proposal due date and time. Failure to comply with this requirement will be cause for rejection of your offer. c. The U.S. Government will not offer "United States Official Contractor" status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as "Members of the Civilian Component" under Article I(b) of the SOFA. Project Information: Project Title: FY28 Frequency Converter Plant Project Location: Yokohama North Dock, Japan Project Magnitude: Between ¥7,500,000,000 and ¥15,000,000,000 (Japanese YEN) Project Description: This project will construct a new 66kV electrical substation and frequency converter plant at Yokohama North Dock. The primary requirement is to provide a permanent and sustainable source of 60Hz shore power for U.S. military watercraft. The project will deliver a complete and usable power distribution system. Key components include: • Primary Facility: A 14,359 SF main substation and frequency converter plant to transform and convert high-voltage 50Hz power from TEPCO to 60Hz. • Supporting Facilities: Construction of electrical distribution lines, a disconnection building, special foundations, and utility connections (water, sewer). • Site & Infrastructure: Installation of paving, site improvements, exterior lighting, and required cybersecurity, fire protection, and anti-terrorism measures.

What changed

No field-level changes were detected between related notices.

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑