This solicitation is for the removal and disposal of dredged material from the Tiger Pass Bar Channel, including utility identification, with an estimated completion time of 135 calendar days. The work is to be performed in New Orleans, LA, and the response deadline is February 5, 2027. [1][4]
Key points
Work involves dredging material removal and utility identification. [1]
Contractor Quality Control plan is required for construction projects. [2]
Watch items
Security requirements apply to contractor IT systems. [1]
Buy American statute evaluation procedures are detailed. [3]
Sources
A21-Solicitation+W912P825B0025.pdfTo provide adequate security, the Contractor shall implement, at a minimum, the following information security protections: (1) For covered contractor information systems that are part of an information technology (IT) service or system operated on behalf of the Government, the following security requirements apply: (i) Cloud computing services shall be subject to the security requirements specified in the clause 252.239-7010, Cloud Computing Services, of this contract. (ii) Any other such IT service or system (i.e., other than cloud computing) shall be subject to the security requirements specified elsewhere in this contract. (2) For covered contractor information systems that are not part
A21-Solicitation+W912P825B0025.pdfTiger Pass Dredging Over Utility Corridor DED24028 SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 45 04.00 10 CONTRACTOR QUALITY CONTROL Contractor Quality Control for construction projects or design-build construction projects PART 1 GENERAL 1.1 MEASUREMENT AND PAYMENT 1.2 SUBMITTALS 1.3 ELECTRONIC TEST REPORT DATA PART 2 PRODUCTS PART 3 EXECUTION 3.1 GENERAL REQUIREMENTS 3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN 3.2.1 Content of the CQC Plan 3.2.2 Acceptance of Plan 3.2.3 Notification of Changes 3.3 MEETINGS 3.3.1 Pre-Work Meetings 3.3.2 Pre-Work Coordination Meeting 3.4 QUALITY CONTROL ORGANIZATION 3.4.1 Personnel Requirements 3.4.2 CQC System Manager 3.4.3 CQC Pe
A21-Solicitation+W912P825B0025.pdfW912P825B0025 Page 30 of 65 (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer recei
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
7 citations · 6 sources
To provide adequate security, the Contractor shall implement, at a minimum, the following information security protections: (1) For covered contractor information systems that are part of an information technology (IT) service or system operated on behalf of the Government, the following security requirements apply: (i) Cloud computing services shall be subject to the security requirements specified in the clause 252.239-7010, Cloud Computing Services, of this contract. (ii) Any other such IT service or system (i.e., other than cloud computing) shall be subject to the security requirements specified elsewhere in this contract. (2) For covered contractor information systems that are not part of an IT service or system operated on behalf of the Government and therefore are not subject to the security requirement specified at paragraph (b)(1) of this clause, the following security requirements apply:
The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services. (End of clause) W912P825B0025 Page 46 of 65 252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) (a) Definitions.
Tiger Pass Dredging Over Utility Corridor DED24028 SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 45 04.00 10 CONTRACTOR QUALITY CONTROL Contractor Quality Control for construction projects or design-build construction projects PART 1 GENERAL 1.1 MEASUREMENT AND PAYMENT 1.2 SUBMITTALS 1.3 ELECTRONIC TEST REPORT DATA PART 2 PRODUCTS PART 3 EXECUTION 3.1 GENERAL REQUIREMENTS 3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN 3.2.1 Content of the CQC Plan 3.2.2 Acceptance of Plan 3.2.3 Notification of Changes 3.3 MEETINGS 3.3.1 Pre-Work Meetings 3.3.2 Pre-Work Coordination Meeting 3.4 QUALITY CONTROL ORGANIZATION 3.4.1 Personnel Requirements 3.4.2 CQC System Manager 3.4.3 CQC Personnel 3.4.4 Additional Requirement 3.4.5 Organizational Changes 3.5 SUBMITTALS AND DELIVERABLES 3.6 CONTROL 3.6.1 Preparatory Phase 3.6.2 Initial Phase 3.6.3 Follow-up Phase 3.6.4 Additional Preparatory and Initial Phases 3.7 COMPLETION INSPECTION 3.7.1 Punch-Out Inspection 3.7.2 Pre-Final Inspection 3.7.3 Final Acceptance Inspection 3.8 DOCUMENTATION 3.9 SAMPLE FORMS 3.10 NOTIFICATION OF NONCOMPLIANCE -- End of Section Table of Contents -- SECTION 01 45 04.00 10 Page 1 Tiger Pass Dredging Over Utility Corridor DED24028 SECTION 01 45 04.00 10 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 MEASUREMENT AND PAYMENT No separate measurement or payment will be made for providing and maintaining an effective Contractor Quality Control program, and all costs associated therewith shall be included in the applicable contract unit or job prices contained in the Bidding Schedule.
W912P825B0025 Page 30 of 65 (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(A)(1) of this clause. (3) The procedures in paragraph (b)(4)(i)(A)(2) of this clause will no longer apply as of January 1, 2030. (B) For domestic construction material that is a critical item or contains critical components. (1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105. (2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(B)(1) of this clause. (3) The procedures in paragraph (b)(4)(i)(B)(2) of this clause will no longer apply as of January 1, 2030. (ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or (iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality. (c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-- (A) A description of the foreign and domestic construction materials; (B) Unit of measure; (C) Quantity; (D) Price; (E) Time of delivery or availability; W912P825B0025 Page 31 of 65 (F) Location of the construction project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause. (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
Description and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings. (The estimated time of completion is 135 calendar days after receipt of Notice to Proceed. The solicitation will include 5 drawings and specifications). No dike work is included with this project. The bid opening will be conducted virtually, please see Section 0010 for Instructions to Bidders.
What changed
No field-level changes were detected between related notices.