Response deadlineJun 18, 2028, 3:00 PM UTC
Deadline status654 days remaining
PostedJun 22, 2026
Record refreshedSep 2, 2026
Place of performanceLA, United States
Opportunity summary
Source-citedThis solicitation is for Freshwater Bayou Maintenance Dredging #26-2, involving the removal and disposal of material from Freshwater Bayou channel in Louisiana. The magnitude of construction is between $10,000,000 and $25,000,000, with a response deadline of June 18, 2028. [2]
Key points
- Work involves dredging and disposing of material in Freshwater Bayou. [1]
- The solicitation is unrestricted and has a magnitude between $10M and $25M. [2]
Watch items
- Bid opening time is to be established by amendment. [2]
- The solicitation will include five drawings and specifications. [2]
Sources
- W912P826BA017+Package+FINAL.pdf
C O D E DATE OF ACTION DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR DATE FWD TO OTHER REVIEWER DATE RCD FROM OTH REVIEWER A C T I O N C O D E DATE OF ACTION MAILED TO CONTR/ DATE RCD FRM APPR AUTH REMARKS (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES Freshwater Bayou Maintenance Dredging 26-1 02 21 10.00 12 3.1.6 Disposal Area Surveys SD-05 Design Data 1.7.5.2 G CD Compiled Survey Data 1.7.5.2 G CD Compiled Survey Data 3.1.3 G ED Preliminary Field Survey 3.1.4 Before and After Dredging Cross Sections 3.1.6 G ED Disposal Area Surveys; 3.1.5 G EDC After Dredging Profiles SD-09 Manufacturer’s Field Repo
- Official SAM.gov notice
Set-aside: No Set aside used
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Public-source intelligence
Source-backed opportunity brief
8 citations · 6 sourcesIn the event of any other inconsistencies between an Enterprise Software Agreement, established as a Federal Supply Schedule blanket purchase agreement, and the Federal Supply Schedule contract, the latter shall govern. (3) The completed address(es) to which the Contractor's mail, freight, and billing documents are to be directed. (b) When placing orders under nonmandatory schedule contracts and requirements contracts, issued by the General Services Administration (GSA) Office of Information Resources Management, for automated data processing equipment, software and maintenance, communications equipment and supplies, and teleprocessing services, the Contractor shall follow the terms of the applicable contract and the procedures in paragraph (a) of this clause. (c) When placing orders for Government stock on a reimbursable basis, the Contractor shall-- (1) Comply with the requirements of the Contracting Officer's authorization, using FEDSTRIP or MILSTRIP procedures, as appropriate; (2) Use only the GSA Form 1948-A, Retail Services Shopping Plate, when ordering from GSA Self-Service Stores; (3) Order only those items required in the performance of Government contracts; and (4) The Contractor shall pay invoices from Government supply sources promptly. (A) The Contractor shall pay purchases made from DoD supply sources within 30 days of the date of a proper invoice. (B) The Contractor shall annotate each invoice with the date of receipt. (C) For the purposes of computing interest for late Contractor payments, the Government's invoice is deemed to be a demand for payment in accordance with the Interest clause of this contract.
Scope
In the event of any other inconsistencies between an Enterprise Software Agreement, established as a Federal Supply Schedule blanket purchase agreement, and the Federal Supply Schedule contract, the latter shall govern. (3) The completed address(es) to which the Contractor's mail, freight, and billing documents are to be directed. (b) When placing orders under nonmandatory schedule contracts and requirements contracts, issued by the General Services Administration (GSA) Office of Information Resources Management, for automated data processing equipment, software and maintenance, communications equipment and supplies, and teleprocessing services, the Contractor shall follow the terms of the applicable contract and the procedures in paragraph (a) of this clause. (c) When placing orders for Government stock on a reimbursable basis, the Contractor shall-- (1) Comply with the requirements of the Contracting Officer's authorization, using FEDSTRIP or MILSTRIP procedures, as appropriate; (2) Use only the GSA Form 1948-A, Retail Services Shopping Plate, when ordering from GSA Self-Service Stores; (3) Order only those items required in the performance of Government contracts; and (4) The Contractor shall pay invoices from Government supply sources promptly. (A) The Contractor shall pay purchases made from DoD supply sources within 30 days of the date of a proper invoice. (B) The Contractor shall annotate each invoice with the date of receipt.
Deliverables
C O D E DATE OF ACTION DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR DATE FWD TO OTHER REVIEWER DATE RCD FROM OTH REVIEWER A C T I O N C O D E DATE OF ACTION MAILED TO CONTR/ DATE RCD FRM APPR AUTH REMARKS (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES Freshwater Bayou Maintenance Dredging 26-1 02 21 10.00 12 3.1.6 Disposal Area Surveys SD-05 Design Data 1.7.5.2 G CD Compiled Survey Data 1.7.5.2 G CD Compiled Survey Data 3.1.3 G ED Preliminary Field Survey 3.1.4 Before and After Dredging Cross Sections 3.1.6 G ED Disposal Area Surveys; 3.1.5 G EDC After Dredging Profiles SD-09 Manufacturer’s Field Reports 3.1.1 Calibration checks 35 20 23.00 12 SD-01 Preconstruction Submittals 1.7.2 Dredge Plant Data 3.2.2 G EDC Plan of Operation 3.3.5 G EDC Disposal of Dredged Material 1.5.3 G EDC Access Plan 1.5.4 G CDC Construction Schedule SD-07 Certificates 3.2.2 G EDC Certified Letters SD-11 Closeout Submittals 1.5.2 G EDC Report of Operations 35 20 23.33 SD-01 Preconstruction Submittals 1.5 G OM Dredge Plant Instrumentation Plan SD-07 Certificates SUBMITTAL REGISTER CONTRACT NO.
Evaluation
If the concern waives the preference, the factor will be added to its offer for evaluation purposes. [ ] Offeror chooses to waive the evaluation preference. (c) Joint venture.
Submission
2018-01 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018) The Offeror shall submit the cost portion of the proposal via the following electronic media: ____ [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.] (End of provision)
Eligibility
Set-aside: No Set aside used
Place of performance
LA, USA
Key dates
Posted Jun 22, 2026; Responses due Jun 18, 2028, 3:00 PM UTC; Archive date Jul 3, 2028
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.