The Department of Defense seeks a contractor to furnish a fully crewed hydraulic pipeline cutterhead dredge for shoal material removal in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. The magnitude of construction is between $10 million and $25 million, with a response deadline of June 12, 2028. [4]
Key points
Work involves dredging in Atchafalaya River Bay, Bar, and Crewboat Cut Channel. [4]
Contractor must use only domestic construction material unless exceptions apply. [2]
Watch items
Environmental protection and water resource monitoring are required. [1]
Offerors must complete and submit all listed provisions with their offer. [3]
Sources
Solicitation+-+W912P826BA065+PACKAGE+FINAL.pdfAtch Bay, Bar, & Crewboat Cut Cutterhead Dredge 2-2026 OM26060 SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION PART 1 GENERAL 1.1 SCOPE 1.2 APPLICABLE REGULATIONS 1.3 MEASUREMENT AND PAYMENT 1.3.1 Environmental Protection 1.3.2 Option Item: Bird Nesting Prevention Measures 1.4 ENVIRONMENTAL PROTECTION PLAN 1.4.1 General 1.4.2 Implementation and Reporting 1.5 NOTIFICATION OF NONCOMPLIANCE 1.6 SUBCONTRACTORS 1.7 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS PART 2 PRODUCTS (Not Used) PART 3 EXECUTION 3.1 PROTECTION OF LAND RESOURCES 3.2 PROTECTION OF WATER RESOURCES 3.2.1 Contamination of Water 3.2.2 Water Quality Monitoring 3.3 PR
Solicitation+-+W912P826BA065+PACKAGE+FINAL.pdfThe Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: none________[Contracting Officer to list applicable excepted materials or indicate "none"] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a
Solicitation+-+W912P826BA065+PACKAGE+FINAL.pdfThe offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Atch Bay, Bar, & Crewboat Cut Cutterhead Dredge 2-2026 OM26060 SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION PART 1 GENERAL 1.1 SCOPE 1.2 APPLICABLE REGULATIONS 1.3 MEASUREMENT AND PAYMENT 1.3.1 Environmental Protection 1.3.2 Option Item: Bird Nesting Prevention Measures 1.4 ENVIRONMENTAL PROTECTION PLAN 1.4.1 General 1.4.2 Implementation and Reporting 1.5 NOTIFICATION OF NONCOMPLIANCE 1.6 SUBCONTRACTORS 1.7 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS PART 2 PRODUCTS (Not Used) PART 3 EXECUTION 3.1 PROTECTION OF LAND RESOURCES 3.2 PROTECTION OF WATER RESOURCES 3.2.1 Contamination of Water 3.2.2 Water Quality Monitoring 3.3 PROTECTION OF FISH AND WILDLIFE 3.3.1 Nesting Birds 3.3.1.1 General 3.3.1.2 Reporting 3.3.1.3 No Work Distances 3.3.1.4 Bird Nesting Prevention Measures 3.3.1.5 Discovery of Bird Nests at the Work Site 3.3.2 Manatee Considerations 3.3.3 Sturgeon 3.4 DISPOSAL OF MATERIALS 3.5 MAINTENANCE OF POLLUTION CONTROL FACILITIES 3.6 POLYSTYRENE AND OTHER CHEMICALLY-FORMED FLOTATION COLLAR MATERIAL USED FOR DREDGE PIPELINES 3.7 JANITOR SERVICES 3.8 REPORTING OF POLLUTION SPILLS (33 CFR 153.203) -- End of Section Table of Contents -- SECTION 01 57 20.00 10 Page 1
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: none________[Contracting Officer to list applicable excepted materials or indicate "none"] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause. (3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January W912P826BA065 Page 34 of 57
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
Notice information
Read full notice text
This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT***
What changed
Jun 16, 2026 · 1 field changed
DocumentsNot previously reported1
Jun 16, 2026 · 1 field changed
Set-asideHistorically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)No Set aside used
Jun 16, 2026 · 4 fields changed
Response deadline2026-06-29T15:00:00+00:002028-06-12T15:00:00+00:00Archive date2027-06-142028-06-27DescriptionDEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118-3651 REPLY TO ATTENTION OF SOLICITATION: W912P826BA064 FOR: Atchafalaya River Bay, Bar, and Crewboat Cut Channel, St. Mary Parish, Louisiana. Cutterhead Dredge Contract No. 1-2026. Specification No. OM26059 Technical inquiries and/or questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.: 9rojnet.org) No Later Than (NL T) Friday, 3 July 2026, 10:00 AM Central Time (CST). To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. Emailed inquiries and/or questions will not be accepted. A prospective vendor who submits a comment /question will receive an acknowledgment of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing. The Bidder Inquiry Key is:44PBW6-CMNJQ6 Specific Instructions for First Time ProjNet Bid Inquiry Access: 1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 2. Identify the Agency. This should be marked as USACE. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Email. Enter the email address you would like to use for communication. 5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form. 6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. Specific Instructions for Future ProjNet Bid Inquiry Access: 1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in. 2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 3. Identify the Agency. This should be marked as USACE. 4. Key. Enter the Bidder Inquiry Key listed above. 5. Email. Enter the email address you used to register previously in ProjNet. 6. Click Continue. A page will then open asking you to enter the answer to your Secret Question. 7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. __________________________________________________________________________ The Bid Opening is to be opened by a future Amendment. I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION. II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION. Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or o er non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause. III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. Contractors must complete and submit with their bid the provisions located in Section 00600. Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001. DESCRIPTION AND MAGNITUDE OF WORK: The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. NOTE: ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF EM 385-1-1 "SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS."This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT***Documents1Removed
Notice history
Solicitation · LatestPosted Jun 16, 2026 · response deadline Jun 12, 2028, 3:00 PM UTC
SolicitationPosted Jun 16, 2026 · response deadline Jun 12, 2028, 3:00 PM UTC
SolicitationPosted Jun 16, 2026 · response deadline Jun 12, 2028, 3:00 PM UTC
SolicitationPosted Jun 14, 2026 · response deadline Jun 29, 2026, 3:00 PM UTC
Attachments
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.