← Active opportunities
OpenSolicitationAmended

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 4-2026, OM26062

Solicitation numberW912P826BA067

DEPT OF DEFENSE · DEPT OF THE ARMY · W07V ENDIST NEW ORLEANS

View opportunity on SAM.gov ↗
Response deadlineJun 12, 2028, 3:00 PM UTC
Deadline status648 days remaining
PostedJun 16, 2026
Record refreshedSep 2, 2026
Place of performanceLA, United States

Opportunity summary

Source-cited

The Department of Defense seeks a fully crewed hydraulic pipeline cutterhead dredge for shoal material removal in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. The magnitude of construction is between $10 million and $25 million, with a response deadline of June 12, 2028. [3]

Key points

  • Work involves dredging in Atchafalaya River Bay, Bar, and Crewboat Cut. [3]
  • Contractor must use only domestic construction material, with exceptions. [2]

Watch items

  • Questions should be sent via email to specified contacts. [1]
  • Bid opening time is to be established by amendment. [3]

Sources

  1. Solicitation+-+W912P826BA067+PACKAGE+FINAL.pdfARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT E-MAIL: francesca.e.deboer@usace.army.mil PHONE: (504) 862-1607 AND/OR E-MAIL: karen.d.hargrave@usace.army.mil PHONE: (504) 862-1561 COLLECT CALLS NOT ACCEPTED NOTE: FOR THE MOST PROMPT RESPONSE PLEASE SEND ALL QUESTIONS VIA E-MAIL Atch Bay, Bar, & Crewboat Cut Cutterhead Dredge 4-2026 OM26062 PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 00 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 10 00 BID SCHEDULE 00 21 00 INSTRUCTIONS 00 22 00 SUPPLEMENTARY INSTRUCTIONS 00 45 00 REPRESENTATIONS AND CERTIFICATIONS 00 70 00 CONDITIONS OF THE CONTRACT 00 72 00 GENERAL CONDITIONS 00 73 00 SUPPLEMENTARY CONDITIONS DIVISI
  2. Solicitation+-+W912P826BA067+PACKAGE+FINAL.pdfThe Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: none________[Contracting Officer to list applicable excepted materials or indicate "none"] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a
  3. Official SAM.gov noticeSet-aside: No Set aside used

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Scope

The Contractor shall submit payment requests using the following document type(s): W912P826BA067 Page 53 of 57 (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items- (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. ____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ____ (Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.) (iii) For customary progress payments based on costs incurred, submit a progress payment request. (iv) For performance based payments, submit a performance based payment request. (v) For commercial financing, submit a commercial financing request. (2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract. [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.] (3) Document routing.

Deliverables

ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT E-MAIL: francesca.e.deboer@usace.army.mil PHONE: (504) 862-1607 AND/OR E-MAIL: karen.d.hargrave@usace.army.mil PHONE: (504) 862-1561 COLLECT CALLS NOT ACCEPTED NOTE: FOR THE MOST PROMPT RESPONSE PLEASE SEND ALL QUESTIONS VIA E-MAIL Atch Bay, Bar, & Crewboat Cut Cutterhead Dredge 4-2026 OM26062 PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 00 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 10 00 BID SCHEDULE 00 21 00 INSTRUCTIONS 00 22 00 SUPPLEMENTARY INSTRUCTIONS 00 45 00 REPRESENTATIONS AND CERTIFICATIONS 00 70 00 CONDITIONS OF THE CONTRACT 00 72 00 GENERAL CONDITIONS 00 73 00 SUPPLEMENTARY CONDITIONS DIVISION 01 - GENERAL REQUIREMENTS 01 30 00 ADMINISTRATIVE REQUIREMENTS 01 33 00 SUBMITTAL PROCEDURES 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 57 20.00 10 ENVIRONMENTAL PROTECTION DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION 35 01 50.73 SURVEYS 35 20 23.23 HYDRAULIC DREDGING 35 20 23.23 09 HYDRAULIC DREDGING – ATCHAFALAYA BAY DREDGING REGION 35 20 23.23 10 HYDRAULIC DREDGING – ATCHAFALAYA BAR DREDGING REGION 35 20 23.23 11 HYDRAULIC DREDGING – ATCHAFALAYA CREWBOAT CUT DREDGING REGION 35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE HYDRAULIC DREDGE -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1

Evaluation

The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: none________[Contracting Officer to list applicable excepted materials or indicate "none"] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause. (3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January W912P826BA067 Page 34 of 57

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT***

What changed

Jun 16, 2026 · 4 fields changed
Response deadline2026-06-29T15:00:00+00:002028-06-12T15:00:00+00:00
Archive date2027-06-142028-06-27
Set-asideHistorically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)No Set aside used
DescriptionDEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118-3651 REPLY TO ATTENTION OF SOLICITATION: W912P826BA067 FOR: Atchafalaya River Bay, Bar, and Crewboat Cut Channel, St. Mary Parish, Louisiana. Cutterhead Dredge Contract No. 4-2026. Specification No. OM26062 Technical inquiries and/or questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.: 9rojnet.org) No Later Than (NL T) Friday, 3 July 2026, 10:00 AM Central Time (CST). To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. Emailed inquiries and/or questions will not be accepted. A prospective vendor who submits a comment /question will receive an acknowledgment of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing. The Bidder Inquiry Key is: KPNKFB-766648 Specific Instructions for First Time ProjNet Bid Inquiry Access: 1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 2. Identify the Agency. This should be marked as USACE. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Email. Enter the email address you would like to use for communication. 5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form. 6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. Specific Instructions for Future ProjNet Bid Inquiry Access: 1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in. 2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 3. Identify the Agency. This should be marked as USACE. 4. Key. Enter the Bidder Inquiry Key listed above. 5. Email. Enter the email address you used to register previously in ProjNet. 6. Click Continue. A page will then open asking you to enter the answer to your Secret Question. 7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. __________________________________________________________________________ The Bid Opening is to be opened by a future Amendment. I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION. II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION. Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or o er non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause. III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. Contractors must complete and submit with their bid the provisions located in Section 00600. Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001. DESCRIPTION AND MAGNITUDE OF WORK: The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. NOTE: ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF EM 385-1-1 "SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS."This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT***

Notice history

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑