Scope
SCOPE OF WORK Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order.
DEPT OF DEFENSE · DEPT OF THE ARMY · W072 ENDIST LOUISVILLE
This solicitation is for Design and Construction Services under the FY26 National Roofing Program (NRP) MATOC Pool for two locations: Fort Rucker, AL, and Camp Shelby, MS. The response deadline is September 9, 2026, and the scope applies requirements from the base MATOC contract. [5][2]
All contractor employees with access to a Government info system must be registered in the ATCTS at commencement of services and must successfully complete the DoD Information Assurance Awareness prior to access to the information system and annually thereafter.
SCOPE OF WORK Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order.
Design Submittal Requirements Instead of a charrette submittal in accordance with the Louisville District Design Guide, the contractor may submit a charrette report after they have conducted an on-site charrette meeting.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations.
W912QR26R1C5X_NRP12-0002 W912QR26R1C5X_NRP12-0002 P2: 574437 National Roofing Program (NRP) FY26 Project 12 AL018/MS800 Ft Rucker, AL/Camp Shelby, MS Version CERTIFIED FINAL Amendment 0002 TABLE OF CONTENTS Amendment 0002 VOLUME A: AL018 Ft Rucker, AL DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS 00 80 50.00 06 Submittal Register DIVISION 01 – GENERAL REQUIREMENTS 01 11 50.00 06 Task Order SCOPE OF WORK ATTACHMENTS ATTACHMENT A: Site Location ATTACHMENT B: Building Layout ATTACHMENT C: Site Inspection Report, April 1, 2026 (For Information Only) Amendment 0002*************************************************************** ATTACHMENT
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
All contractor employees with access to a Government info system must be registered in the ATCTS at commencement of services and must successfully complete the DoD Information Assurance Awareness prior to access to the information system and annually thereafter.
SCOPE OF WORK Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order.
Design Submittal Requirements Instead of a charrette submittal in accordance with the Louisville District Design Guide, the contractor may submit a charrette report after they have conducted an on-site charrette meeting.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations.
W912QR26R1C5X_NRP12-0002 W912QR26R1C5X_NRP12-0002 P2: 574437 National Roofing Program (NRP) FY26 Project 12 AL018/MS800 Ft Rucker, AL/Camp Shelby, MS Version CERTIFIED FINAL Amendment 0002 TABLE OF CONTENTS Amendment 0002 VOLUME A: AL018 Ft Rucker, AL DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS 00 80 50.00 06 Submittal Register DIVISION 01 – GENERAL REQUIREMENTS 01 11 50.00 06 Task Order SCOPE OF WORK ATTACHMENTS ATTACHMENT A: Site Location ATTACHMENT B: Building Layout ATTACHMENT C: Site Inspection Report, April 1, 2026 (For Information Only) Amendment 0002*************************************************************** ATTACHMENT D Pre Proposal Site Visit Photos ***************************************************************Amendment 0002 VOLUME B: MS800 Camp Shelby, MS DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS 00 80 50.00 06 Submittal Register DIVISION 01 – GENERAL REQUIREMENTS 01 11 50.00 06 Task Order SCOPE OF WORK ATTACHMENTS ATTACHMENT A: Site Location ATTACHMENT B: Building Layout ATTACHMENT C: Site Inspection Report, March 20, 2026 (For Information Only) --End of Table of Contents-- W912QR26R1C5X_NRP12-0002 June 2026 Solicitation ARIMS: 200A Disposition: Maintain for 15 yrs after construction Army Reserve National Roofing Program FY26 Task Order 12 Volume A AL018 Fort Rucker, AL DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS 00 80 50.00 06 Submittal Register DIVISION 01 – GENERAL REQUIREMENTS 01 11 50.00 06 Task Order SCOPE OF WORK ATTACHMENTS ATTACHMENT A: ATTACHMENT B: ATTACHMENT C: Version CERTIFIED FINAL Site Location Building Layout Site Inspection Report, March 20, 2026 (For Information Only) Amendment 0002*************************************************************** ATTACHMENT D Pre Proposal Site Visit Photos ***************************************************************Amendment 0002 Amendment 0002 W912QR26R1C5X_NRP12-0002 NRP FY26 Project 12 AL018 Fort Rucker, AL P2 574437 10-Jul-26 SECTION 01 11 50.00 06 Version CERTIFIED FINAL Page 1 Amendment 0002 SECTION 01 11 50.00 06 Task Order SCOPE OF WORK Amendment 0002 1.
Fort Rucker, AL, USA
Posted Aug 27, 2026; Responses due Sep 9, 2026, 6:00 PM UTC; Archive date Sep 24, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
****Amendment 0002 posted on 27 August 2026**** ****Amendment 0001 posted on 25 August 2026**** ****This Solicitation is for the NRP MATOC Pool Only**** Reference is made to your Indefinite Delivery Contract Numbers W912QR24D0054 - W912QR24D0063, Indefinite Delivery Indefinite Quantity (IDIQ), Design-Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of the U.S. Army Reserves National Roofing Program (NRP), Army, and Air Force Reserve Sections.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.