← Active opportunities
OpenSolicitationAmended

REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKS

Solicitation numberW912QR26QA084

DEPT OF DEFENSE · DEPT OF THE ARMY · W072 ENDIST LOUISVILLE

View opportunity on SAM.gov ↗
Response deadlineSep 11, 2026, 3:00 PM UTC
Deadline status8 days remaining
PostedAug 31, 2026
Record refreshedSep 2, 2026
Place of performancePlease note: Two Locations: John T Myers Locks and Dam16501 Raben Rd. Mt Vernon, IN 47620_________Newburgh Locks and Dam 6877 State Rd. 66Newburgh, IN 47630, Mount Vernon, IN, 47620, United States

Opportunity summary

Source-cited

This solicitation requires replacing two UPS units and two external battery packs at John T Myers and Newburgh Locks in Indiana. The contract scope includes all necessary planning, labor, and materials, with a response deadline of September 11, 2026. [1][3]

Key points

  • Scope involves replacing two UPS and two battery packs [1]
  • Small Business Set Aside - Total [3]

Watch items

  • Response deadline is September 11, 2026 [3]
  • Submission must be electronic via PIEE [2]

Sources

  1. JTM+NBG+UPS+Replacement_SOW.pdfGENERAL REQUIREMENTS This scope of work includes replacing two (2) uninterruptible power supplies (UPS), and two (2) external battery packs at the locations identified below.
  2. PIEE+Directions.pdfELECTRONIC PROPOSAL SUBMISSION Offerors shall submit one (1) electronic copy of their offer via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 13 of this SF 1442.
  3. Official SAM.gov noticeSet-aside: Small Business Set Aside - Total

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

8 citations · 6 sources

If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no cost to the Government.

Scope

GENERAL REQUIREMENTS This scope of work includes replacing two (2) uninterruptible power supplies (UPS), and two (2) external battery packs at the locations identified below.

Deliverables

The TPOC may alter this reporting schedule, or change the reporting method, time, or place if mutually agreeable between the TPOC and the Contractor.

Evaluation

Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Submission

ELECTRONIC PROPOSAL SUBMISSION Offerors shall submit one (1) electronic copy of their offer via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 13 of this SF 1442.

Place of performance

Please note: Two Locations: John T Myers Locks and Dam16501 Raben Rd. Mt Vernon, IN 47620_________Newburgh Locks and Dam 6877 State Rd. 66Newburgh, IN 47630, Mount Vernon, IN, 47620, USA

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

PROJECT TITLE: REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKSPROJECT LOCATION: MT VERNON, IN 47620 AND NEWBURGH, IN 47630THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO REPLACE TWO (2) UNINTERRUPTIBLE POWER SUPPLIES (UPS), AND TWO (2) EXTERNAL BATTERY PACKS AT THE LOCATIONS IDENTIFIED BELOW. PRICES SHOULD INCLUDE MOBILIZATION and DE-MOBILIZATION, FUEL, LABOR, MATERIAL, EQUIPMENT AND ANY APPLICABLE PERMITS. THE CONTRACTORS WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS IS BETWEEN $25,000 AND $100,000. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE. ****** AMENDMENT 0001 ***** HAS BEEN POSTED TO UPDATE THE DUE DATE OF THE SOLICITATION FROM 04 SEPTEMBER 2026 AT 11:00AM EDT TO 11 SEPTEMBER 2026 AT 11:00AM EDT. A SIGNED COPY OF THE AMENDMENT MUST BE RETURNED WITH THE QUOATION.

What changed

Aug 31, 2026 · 4 fields changed
Response deadline2026-09-04T15:00:00+00:002026-09-11T15:00:00+00:00
Archive date2026-09-192026-09-26
DescriptionPROJECT TITLE: REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKSPROJECT LOCATION: MT VERNON, IN 47620 AND NEWBURGH, IN 47630THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO REPLACE TWO (2) UNINTERRUPTIBLE POWER SUPPLIES (UPS), AND TWO (2) EXTERNAL BATTERY PACKS AT THE LOCATIONS IDENTIFIED BELOW. PRICES SHOULD INCLUDE MOBILIZATION and DE-MOBILIZATION, FUEL, LABOR, MATERIAL, EQUIPMENT AND ANY APPLICABLE PERMITS. THE CONTRACTORS WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS IS BETWEEN $25,000 AND $100,000. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE.PROJECT TITLE: REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKSPROJECT LOCATION: MT VERNON, IN 47620 AND NEWBURGH, IN 47630THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO REPLACE TWO (2) UNINTERRUPTIBLE POWER SUPPLIES (UPS), AND TWO (2) EXTERNAL BATTERY PACKS AT THE LOCATIONS IDENTIFIED BELOW. PRICES SHOULD INCLUDE MOBILIZATION and DE-MOBILIZATION, FUEL, LABOR, MATERIAL, EQUIPMENT AND ANY APPLICABLE PERMITS. THE CONTRACTORS WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS IS BETWEEN $25,000 AND $100,000. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE. ****** AMENDMENT 0001 ***** HAS BEEN POSTED TO UPDATE THE DUE DATE OF THE SOLICITATION FROM 04 SEPTEMBER 2026 AT 11:00AM EDT TO 11 SEPTEMBER 2026 AT 11:00AM EDT. A SIGNED COPY OF THE AMENDMENT MUST BE RETURNED WITH THE QUOATION.
Documents910
Aug 18, 2026 · 4 fields changed
Archive date2027-08-182026-09-19
Set-asideNot previously reportedSmall Business Set Aside - Total
DescriptionPROJECT TITLE: REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKSPROJECT LOCATION: MT VERNON, IN 47620 AND NEWBURGH, IN 47630THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO REPLACE TWO (2) UNINTERRUPTIBLE POWER SUPPLIES (UPS), AND TWO (2) EXTERNAL BATTERY PACKS AT THE LOCATIONS IDENTIFIED BELOW. PRICES SHOULD INCLUDE MOBILIZATION and DE-MOBILIZATION, FUEL, LABOR, MATERIAL, EQUIPMENT AND ANY APPLICABLE PERMITS. THE CONTRACTORS WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN.DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS IS BETWEEN $25,000 AND $100,000.INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE.PROJECT TITLE: REPLACE UPS AT JT MYERS LOCKS AND NEWBURGH LOCKSPROJECT LOCATION: MT VERNON, IN 47620 AND NEWBURGH, IN 47630THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO REPLACE TWO (2) UNINTERRUPTIBLE POWER SUPPLIES (UPS), AND TWO (2) EXTERNAL BATTERY PACKS AT THE LOCATIONS IDENTIFIED BELOW. PRICES SHOULD INCLUDE MOBILIZATION and DE-MOBILIZATION, FUEL, LABOR, MATERIAL, EQUIPMENT AND ANY APPLICABLE PERMITS. THE CONTRACTORS WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS IS BETWEEN $25,000 AND $100,000. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE.
DocumentsNot previously reported9

Notice history

  • Solicitation · LatestPosted Aug 31, 2026 · response deadline Sep 11, 2026, 3:00 PM UTC
  • SolicitationPosted Aug 18, 2026 · response deadline Sep 4, 2026, 3:00 PM UTC
  • SolicitationPosted Aug 18, 2026 · response deadline Sep 4, 2026, 3:00 PM UTC

Attachments

Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.

Back to top ↑