Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin

Solicitation numberW912QR26QA094

DEPT OF DEFENSE · DEPT OF THE ARMY · W072 ENDIST LOUISVILLE

View opportunity on SAM.gov ↗
Response deadlineSep 11, 2026, 5:00 PM UTC
Deadline status8 days remaining
PostedAug 26, 2026
Record refreshedAug 27, 2026
Place of performanceUnited States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141, 42141

Opportunity summary

Source-cited

This solicitation is for the Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin, requiring furnishing all necessary labor and materials. The contract award will be based on the lowest total price, and it is 100% set-aside for Small Business under NAICS 238910. [1]

Key points

  • Work must start within 10 days and finish within 180 days. [1]
  • Procurement is 100% set-aside for Small Business, NAICS 238910. [1]

Watch items

  • Quotes are due on September 11, 2026, at 12:00 PM ET. [1]
  • A site visit is recommended for September 8, 2026, at 0900 CT. [1]

Sources

  1. Official SAM.gov noticeWork will shall begin within 10 calendar days of Notice to Proceed and must conclude 180 calendar days after Notice to Proceed.Location:United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141This procurement is 100% set-aside for Small Business, NAICS 238910, Size Standard $19M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

6 citations · 1 source

Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 180 calendar days after Notice to Proceed.Location:United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141This procurement is 100% set-aside for Small Business, NAICS 238910, Size Standard $19M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements.

Scope

Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor?????????????????????????????????????????????????????????????????????????????????s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations.

Submission

Please reach out to Ryan Weaver at 270-646-2055 or Ryan.A.Weaver@usace.army.mil to confirm your attendance.Quotes are due 11 September 2026, 12:00PM Eastern Time.

Place of performance

United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141, 42141

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor?????????????????????????????????????????????????????????????????????????????????s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 180 calendar days after Notice to Proceed.Location:United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141This procurement is 100% set-aside for Small Business, NAICS 238910, Size Standard $19M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. The site visit is scheduled for 8 September 2026, 0900 CT. Please reach out to Ryan Weaver at 270-646-2055 or Ryan.A.Weaver@usace.army.mil to confirm your attendance.Quotes are due 11 September 2026, 12:00PM Eastern Time.