Electrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticut

Solicitation numberW912WJ26BA013

DEPT OF DEFENSE · DEPT OF THE ARMY · W2SD ENDIST NEW ENGLAND

View opportunity on SAM.gov ↗
Response deadlineSep 10, 2026, 5:00 PM UTC
Deadline status7 days remaining
PostedAug 28, 2026
Record refreshedAug 29, 2026

Opportunity summary

Source-cited

The U.S. Army Corps of Engineers is seeking an Invitation for Bids for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This is a 100% Small Business Set-Aside IFB procurement with an estimated magnitude between $750,000 and $1,250,000. [1]

Key points

  • Work involves electrical feeder upgrades at the dam. [1]
  • The procurement is a 100% Small Business Set-Aside IFB. [1]

Watch items

  • Response deadline is September 10, 2026. [1]
  • Project period of performance is approximately 180 days. [1]

Sources

  1. Official SAM.gov noticeArmy Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut.

Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.

Public-source intelligence

Source-backed opportunity brief

2 citations · 1 source

Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut.

Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.

Notice information

Read full notice text

The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.

What changed

Aug 28, 2026 · 2 fields changed
Response deadline2026-09-04T17:00:00+00:002026-09-10T17:00:00+00:00
Archive date2027-08-212027-08-28
Aug 21, 2026 · 2 fields changed
Response deadline2026-09-03T17:00:00+00:002026-09-04T17:00:00+00:00
Archive date2027-08-202027-08-21
Aug 20, 2026 · 2 fields changed
Response deadline2026-09-01T17:00:00+00:002026-09-03T17:00:00+00:00
Archive date2027-07-312027-08-20
Jul 31, 2026 · 7 fields changed
TitleElectrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, ConnecticutElectrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticut
Notice typePresolicitationSolicitation
Response deadlineNot previously reported2026-09-01T17:00:00+00:00
Archive date2026-07-302027-07-31
Set-asideTotal Small Business Set-Aside (FAR 19.5)Removed
DescriptionBlack Rock Lake Dam, Thomaston, CT - Electrical Feeder Upgrades The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000. The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank. The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset. Please note that this solicitation is set aside for certified small businesses. This is not a request for proposals at this time; the solicitation requirements and contract documents which will include instructions for submission, and the response date will be available on or about July 2026. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist at Kayla.Gonsalves@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service.The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.
Documents1Removed

Notice history

  • Solicitation · LatestPosted Aug 28, 2026 · response deadline Sep 10, 2026, 5:00 PM UTC
  • SolicitationPosted Aug 21, 2026 · response deadline Sep 4, 2026, 5:00 PM UTC
  • SolicitationPosted Aug 20, 2026 · response deadline Sep 3, 2026, 5:00 PM UTC
  • SolicitationPosted Jul 31, 2026 · response deadline Sep 1, 2026, 5:00 PM UTC
  • PresolicitationPosted Jul 13, 2026 · response deadline Deadline not provided