Scope
The contractor shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
DEPT OF DEFENSE · DEPT OF THE ARMY · W2SD ENDIST NEW ENGLAND
This solicitation involves the construction of a new chilled water plant and site utility upgrades at a VA Medical Center in West Haven, CT. The project requires compliance with various disciplines, including LEED Silver certification and minimal impact on active operations. [1][2]
0 0 1 5 7 8 7 Department of Veterans Affairs Solicitation #W912WJ26RA008/VA #VAWH-689-040 West Haven VA Medical Center Phase A2-Chilled Water Plant Replacement PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 32 00 08/02 GEOTECHNICAL DATA DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 11/21 GENERAL REQUIREMENTS 01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK 01 14 00 WORK RESTRICTIONS 01 22 00 04/94 MEASUREMENT AND PAYMENT 01 30 00 11/20, CHG 1: 08/21 ADMINISTRATIVE REQUIREMENTS 01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE 01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES 01 33 21 02/20 CONSTRUCTION PHASE BIM, CIM, AND CAD REQUIREMENTS 01 35 26 05/24 GOVER
Posted Aug 24, 2026; Responses due Oct 23, 2026, 5:00 PM UTC; Archive date Aug 24, 2027
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
0 0 1 5 7 8 7 Department of Veterans Affairs Solicitation #W912WJ26RA008/VA #VAWH-689-040 West Haven VA Medical Center Phase A2-Chilled Water Plant Replacement PROJECT TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 32 00 08/02 GEOTECHNICAL DATA DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 11/21 GENERAL REQUIREMENTS 01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK 01 14 00 WORK RESTRICTIONS 01 22 00 04/94 MEASUREMENT AND PAYMENT 01 30 00 11/20, CHG 1: 08/21 ADMINISTRATIVE REQUIREMENTS 01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE 01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES 01 33 21 02/20 CONSTRUCTION PHASE BIM, CIM, AND CAD REQUIREMENTS 01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS 01 35 50 05/24 CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT 01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS 01 43 30 01/25 MOCKUPS 01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL 01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 45 29 TESTING LABORATORY SERVICES 01 45 35 11/20 SPECIAL INSPECTIONS 01 45 41 EXTERIOR ENCLOSURE PERFORMANCE REQUIREMENTS, MOCKUPS, AND TESTING 01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 01 58 00 08/19, CHG 3: 11/21 PROJECT IDENTIFICATION 01 58 16 TEMPORARY INTERIOR SIGNAGE 01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS 01 78 23 05/23 OPERATION AND MAINTENANCE DATA 01 81 13 10/17 SUSTAINABLE CONSTRUCTION REQUIREMENTS 01 81 13.02 4/23 SUSTAINABILITY CERTIFICATION REQUIREMENTS - LEED v4 BD+C 01 86 25 CYBERSECURITY FOR FACILITY RELATED CONTROL SYSTEMS 01 91 00.01 05/19, CHG 2: 08/20 DVA/USACE PROJECTS GENERAL COMMISSIONING REQUIREMENTS DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION 02 82 11 1/21 TRADITIONAL ASBESTOS ABATEMENT 02 82 13.13 1/21 GLOVEBAG ASBESTOS ABATEMENT 02 83 33.13 1/21 LEAD-BASED PAINT REMOVAL AND DISPOSAL DIVISION 03 - CONCRETE 03 30 00 1/21 CAST-IN-PLACE CONCRETE DIVISION 04 - MASONRY DOCUMENT PROJECT Page 1
The contractor shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
Contractor entries generally include prime and subcontractor information, daily reports, submittals, RFI's, schedule updates and payment requests.
2.5 BACKFLOW PREVENTERS Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval.
Resubmit the submittal register and annotate it monthly with actual submission and approval dates.
Posted Aug 24, 2026; Responses due Oct 23, 2026, 5:00 PM UTC; Archive date Aug 24, 2027
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.