Scope
If the scope of work includes work within the drip line, the contractor shall bore any required utilities below or through the root system, avoiding the largest roots near base of the tree, in lieu of trenching.
DEPT OF DEFENSE · DEPT OF THE ARMY · W6QM MICC-FT LEAVENWORTH
The Department of Defense seeks a contractor for the full demolition and replacement of an existing MRL elevator at Building 246 in Fort Leavenworth, KS. The new hydraulic, holeless, roped, single jack, cantilever passenger elevator must be 100% non-proprietary and meet ANSI A17.1-2016 requirements. [2]
Submittal_(Contract_Bldg_#56_tiles) ・SD-01 Pre-Construction Submittals ・Material Safety Data Sheet shall be provided when hazardous chemicals are used. ・Construction Schedule – Schedule shall be viewable in PDF (updated weekly or as changes happen) ・Key Personnel Staffing Plan (SW-1e) ・Site Specific Safety Plan (SW-4b) ・Quality Control Plan (SW-6) ・Project Signage (SW-7) ・Submittal Registry / LOG for all submittals intended for project ・SD-02 Shop Drawings ・SD-03 Product Data (SW-5): ・All products, materials and equipment used in the project ・All serial #s, Model Number, Manufacturer information of items removed and installed. (Form provided) ・Purchase dates and proposed delivery dates provi
Set-aside: Small Business Set Aside - Total
Generated from the public notice and source-backed solicitation passages. Confirm important requirements in the cited brief and official documents.
Contractor and all associated sub- contractors' employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
If the scope of work includes work within the drip line, the contractor shall bore any required utilities below or through the root system, avoiding the largest roots near base of the tree, in lieu of trenching.
Submittal_(Contract_Bldg_#56_tiles) ・SD-01 Pre-Construction Submittals ・Material Safety Data Sheet shall be provided when hazardous chemicals are used. ・Construction Schedule – Schedule shall be viewable in PDF (updated weekly or as changes happen) ・Key Personnel Staffing Plan (SW-1e) ・Site Specific Safety Plan (SW-4b) ・Quality Control Plan (SW-6) ・Project Signage (SW-7) ・Submittal Registry / LOG for all submittals intended for project ・SD-02 Shop Drawings ・SD-03 Product Data (SW-5): ・All products, materials and equipment used in the project ・All serial #s, Model Number, Manufacturer information of items removed and installed. (Form provided) ・Purchase dates and proposed delivery dates provided from manufacturer/subcontractor on their letterhead without pricing ・SD-04 Samples (SW-5a): ・SD-05 Design Data Calculations (SW-5a) ・SD-06 Test Reports (SW-5a) ・SD-07 Certificates (SW 5a) ・SD-08 Manufacturer's Instructions (SW-5a) ・SD-09 Manufacturer's Field Reports ・SD-10 Operation and Maintenance Manuals (SW-3g) ・SD-11 Closeout Submittals Documentation: ・Draft DD 1354 Form & Final DD 1354 Form (SW-3i) ・Warranty Information (SW-3j) ・Debris Recovery Statement Form (attached) (SW-3c) ・As-Built Drawings (SW-3d) B246 – Elevator Modernization Statement of Work 18 June 2026 SW-6 QUALITY CONTROL This contract has a requirement for quality control.
W91QF426BA011 Page 63 of 66 Section M - Evaluation Factors for Award FACTORS FOR EVALUATION M.1.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
Set-aside: Small Business Set Aside - Total
Fort Leavenworth, KS, 66027, USA
Posted Aug 10, 2026; Responses due Sep 8, 2026, 7:00 PM UTC; Archive date Sep 23, 2026
Extracted from the official notice and archived solicitation files. Confirm controlling requirements in the source documents.
The building 246 requires a full demolition and replacement of its' existing MRL elevator and associated equipment and support structure. The record drawings for the most recent renovation and elevator repairs shall be provided in this solicitation. The new elevator shall be installed with a 100% non-proprietary system, being that when future maintenance is required, any elevator repair technician has the capability of performing repairs. The contractor shall provide 3 front openings with 24'3" of travel that opens at 100 FPM. The new elevator shall be hydraulic, holeless, roped, single jack, cantilever, passenger elevator with a 4,500 lb capacity. The contractor shall comply with ANSI A17.1-2016 requirements.
Open a filename to view the saved source file. If a saved copy is not available yet, FedRoster will continue to the matching SAM.gov notice.