Sources Sought
Selma Alabama Flood Risk Management and Bank Stabilization Project
DEPT OF DEFENSE · DEPT OF THE ARMY · W074 ENDIST MOBILE
NAICS 237990PSC Z2KZAmended
Response deadlineSep 2, 2026
PostedAug 12, 2026
SolicitationW9127826RA105
Notice IDc0b79844152842d7a68e64fd18c83dda
Notice typeSources Sought
Set-aside
Place of performance36702
AwardNot posted
Notice description
The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.
Notice and amendment history
- Sources Sought · LatestPosted Aug 12, 2026 · closes Sep 2, 2026
Attachments
No attachments are currently listed.