Combined Synopsis/Solicitation
F--OR - Klamath Marsh NWR -FUEL REDUCTION
INTERIOR, DEPARTMENT OF THE · US FISH AND WILDLIFE SERVICE · FWS, OVER SAT G/S
Small Business Set Aside - TotalNAICS 238910PSC F099Amended
Response deadlineSep 1, 2026
PostedAug 28, 2026
Solicitation140F0S26Q0056
Notice IDdedd69337eea4188919e0fd1b27c102f
Notice typeCombined Synopsis/Solicitation
Set-asideSmall Business Set Aside - Total
Place of performance
AwardNot posted
Notice description
Klamath Marsh NWR, OR - Hazardous Fuels Reduction and Habitat Enhancement - Site B It is highly recommended that the Contractor visit the site prior to quoting. To arrange a site visit, contact Riley (530) 708-7723. See B09 file for geo referenced map See SOW attached. Vendor will submit a statement that the vendor understands the work and understands the environment and condition the work will be performed in and fill out the quote sheet on the first page of the attachment. Send packets and questions to Robert_Sung@ios.doi.gov with "140F0S26Q0056 - Klamath Marsh - B" in the subject line RFI: Q1. Approximately what percentage or number of acres does the Government anticipate will require exclusively manual cutting and hand piling because of surface-water exclusions, sensitive meadows, aspen protection, or unsuitable ground conditions? A1. Sensitive areas that may require hand treatment are expected to be less than 10% of the total acres. Q2. Will the approximately 15% of the project designated for habitat-retention clumps be included in the measured and accepted acreage for payment? A2. Yes Q3. Will any reduction of the 100-foot mechanical-equipment exclusion during dry or frozen ground conditions be determined during the post-award unit-delineation process? A3. It will be post-award. The water levels at Klamath Marsh fluctuate throughout the year and can differ substantially year to year.
Notice and amendment history
- Combined Synopsis/SolicitationPosted Aug 28, 2026 · closes Sep 1, 2026
- Combined Synopsis/Solicitation · LatestPosted Aug 28, 2026 · closes Sep 1, 2026
- Combined Synopsis/SolicitationPosted Aug 20, 2026 · closes Aug 25, 2026
- Combined Synopsis/SolicitationPosted Aug 20, 2026 · closes Aug 25, 2026
- Combined Synopsis/SolicitationPosted Aug 19, 2026 · closes Aug 24, 2026
- Combined Synopsis/SolicitationPosted Aug 17, 2026 · closes Aug 24, 2026
Attachments
No attachments are currently listed.