Fiber Installation
Fiber Installation in accordance with Performance Work Statement (PWS)
- Agency
- DEPT OF DEFENSE
- Closes
- Sep 10, 2026
- Files
- 3
Search current notices and review the details, deadlines, contacts, amendments, and source files that shape the opportunity.
Fiber Installation in accordance with Performance Work Statement (PWS)
Amendment 0001: The purpose of this amendment is to: 1. Attach "Appendix A - Cost Breakdown" to Section J. 2. All other terms and conditions remain unchanged. -----------------------------------------------------------------------------------------------------------------------------------------------------------------
AK-KENAI NWR-AUDIOVISUAL REPAIR
SOW was revised on 26 August 2026. This is a formal Request for Proposal (RFP) for commercial construction services prepared in accordance with Revolutionary FAR Overhaul (RFO) 12.201, and in conjunction with RFO Part 36 procedures. This effort is being competitively solicited among all Small Businesses on SAM.gov. Thi
South Pedestrian and Vehicle Gate Access Control Cable Repair
Amendment 1 is being issued to publish campus wide maps and to extend the deadline for questions and the deadline for the submission of quotes. The goal of this project is to remove and replace the existing public address system across the entire Robert J. Dole VA Medical Center campus. This new system will replace all
This is a new requirement for outside and inside plant cable installation, surveys, and maintenance in accordance with (IAW) attached Performance Work Statement (PWS). All questions: Must be submitted via email to Jean-Denis Ducimetiere at jean-denis.ducimetiere@us.af.mil no later than 1 September 2026 at 12:00 PM MDT.
The Air Force Test Center (AFTC), Operational Contracting Division, Eglin Air Force Base, Florida, is issuing Request for Quotations (RFQ) FA282326Q0065 to establish a contract for FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION. All work shall be performed in accordance with (IAW) Salient Characteristics, dated
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items as supplemented with additional information included in this notice. This announcement and the attached Request for Quotat
This project consists of furnish and installing 2 new electrical panel boards on the Colville National Forest , Colville, WA. This project is being solicited in accordance with FAR 12.201-1(c)(2). The Government will issue a request for quotes directly from local contractors, and will not issue a solicitation on SAM.go
Alteration Installation Team (AIT) service requirements to include shipboard and technician support, industrial ship services, operational support, and logistical and material support services for Electro-Optical, Electronic Offboard Countermeasures, Fleet Demonstration and Flex Demo systems, and Electronic Attack (EA)
See attached.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0134 is issued as a Request for Qu
Reynosa IT Wiring POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov The implementation of 62 data points and the installation, labeling, certification, and documentation of a complete Cat 6 Structured Cabling System. Preparation of "as-built" drawings and technical reports necessary for the design and ins