This amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation M
Notice ID: W912P626QA028Primary Solicitation Manager: Adam Haley Subject: Salamonie Lake Garage Door Replacement Description: This Solicitation Notice is being issued by the U.S. Army Corps of Engineers, Chicago District, to inform interested contractors of the Districts intent to issue a construction solicitation for
The 126th Air Refueling Wing has a requirement for emergency roof repairs to Building 5026 (MXG Main Hangar) at Scott AFB, IL. Please refer to the attached document titled "Combined Synopsis-Solicitation_W50S7S26Q0030" for full details regarding this requirement. The attached document contains the Requirement Descripti
The 175th Maryland Air National Guard has a requirement to install an epoxy flooring to Warehouse Building 3010 on base. Please refer to the Attachment #1 Statement of Work and other attached documentation for a more detailed description for the work to be done on the project. Please find Amendment 0001 to the Solicita
This notice serves as the formal Request for Proposal (RFP) from the Army Contracting Command, Aberdeen Proving Ground (ACC-APG) Natick Division for a single award construction contract for the Building 45 DPW Repair Renovation. This building is located at the U.S. Army Natick Soldier Systems Center (NSSC), 10 General
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1232SA26Q1227 is issued as a Request for Qu
This project provides the necessary upgrades to building #203 aircraft engine shop, to maintain the required number of new C130J aircraft engines and propellers to support the YARS mission. The renovations to building 203 include the construction of enclosed areas within the existing workshop, facilitating the ability