DESCRIPTION OF REQUIREMENT This is a new construction requirement for the installation of a "Type K" security fence with barbed wire and two power transfer points system for the B456 NAOC Lower Lot at Offutt AFB, Nebraska. This acquisition is set aside for a small business concern under NAICS 238990, All Other Specialt
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Amendment 0001 Amendment 0002 Amendment 0003 Amendment 0004
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
This is a solicitation for commercial construction prepared in accordance with RFO Parts 12 & 36. Solicitation number 12445526Q0121 is issued as a Request for Quotation (RFQ) for the sanding, repair, and re-finishing of the existing maple flooring at the Mondeaux Lodge. This acquisition is set-aside for small business
***AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026*** ***AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026*** ***The Site Visit Roster was posted on 17 August 2026*** ***AMENDMNENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON FRIDAY, 31 JULY 2026*** The Response Date Time Zone is Eastern Time (ET). All Amendment 0002 doc
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Amendment 0001
This procurement is restricted to the M&R MACC contractors. Only the M&R MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Amendment 0001
August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers t
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install a new EPDM roof system over the existing roofing systems at 5378 Lindberg Street at USCG Base Cape Cod Housing units in Bourne, MA 02542. SEE SOW FOR FULL REQUIREMENTS
Amendment 0002 RESCHEDULED: Site Visit Amendment 0001 Updated Wage Determination Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered and certified as an SDVOSB on the SBAs MySBA Certifications website at https://certifications.sba.gov/ and be able to be verified on the SBAs S
Amendment 0001 issued to change the scheduled site visit to Wednesday, September 2, 2026, at 10 AM Eastern. Point of contact: wendy_deleon@nps.gov and kathleen_pelszynski@nps.gov. See provision Site Visit (Construction) for further details. Participants will meet at: 309 Walnut Street, Philadelphia, PA 19106.
Amendment 1: The purpose of this amendment is to extend the solicitation proposal 10 days, extending the due date from 24 August 2026 at 2:00 CST to 03 September 2026 at 2:00 CDT. NOTICE 1: The answers to the RFIs have been posted along with the Site Visit Sign-In Sheet. NOTE: Contractors/Offerors must complete CUI Tra
This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditi
Solicitation number 12445526Q0139 is issued as a Request for Quotation (RFQ) for SUF Laurentian Divide Kiosk Repair. PROJECT SUMMARY: This project is for construction services to replace the roof, paint the fascia, and stain support beams on the information kiosk located at the Laurentian Divide Recreation Area, Superi
This is for the installation of cementitious urethane coatings with a satin polyaspartic topcoat floor at US Naval Research Laboratory (NRL), Bldg. 101, Rm 140 and 153. Full description and response requirements are included in the attachement N0017326Q1901. A site visit is required on Thursday, Aug 27 at 9:00am EDT.
The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specifications to replace building 635s exterior doors, frames and locking mechanisms. The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necess