Work performed consists of minor site development, construction of concrete water diversion curbing, interior renovations to lighting, HVAC, doors, roofing, doors and entry gate operators.Contractor shall provide all tools, qualified labor, materials, equipment, supplies, and supervision necessary to engineer, install,
This is a construction requirement for the repair of the Fire House Kitchen B708.Period of Performance: 90 Calendar Days after Notice to Proceed issuance. Competition: This requirement is a 100% Small Business Concern Set Aside for North American Industry Classification System (NAICS) code 236220. The Magnitude of this
Description of work: Project titled Maintain Exterior Finishes includes constructing, maintaining and repairing the exterior of buildings and structures around Malmstrom Air Force Base, Montana. Work may include window replacement/installation, exterior painting, masonry repair, soffit and fascia repair, parapet wall
The Buckley SFB Outdoor Recreation (ODR) facility (Bldg. 1022) is upgrading its reception area to improve service delivery and organizational workflow. This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a
McConnell AFB Multiple Award Construction Contract (MACC) Solicitation FA4621-26-R-0001 The 22d Contracting Squadron (22 CONS) of the 22d Air Refueling Wing, McConnell AFB KS, hereby releases the McConnell AFB Multiple Award Construction Contract (MACC) solicitation. The Government intends to award up to seven (7) firm
SOURCES SOUGHT SYNOPSIS Job Order Contract for Joint Base Lewis McChord (JBLM), Washington This is a Sources Sought Synopsis (SSS) ONLY. The United States (U.S.) Government desires to procure a Job Order Contract at Joint Base Lewis McChord (JBLM), Washington, on a small business set-aside basis, provided 2 or more qua
The work includes Replacing the metal panel roof and support beams for Bldg 4433. and incidental related work. Only the MACC holders listed on the first page of the solicitation may submit a proposal for this project.
Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
SITE VISIT - A Site Visit is scheduled for Tuesday, August 25th, at 10:00 AM CST on site at MICC Fort Leavenworth, 731 McClellan Avenue, Building Number 48 (Room 112). The purpose is to conduct an Invitation for Bid (IFB) Overview for perspective bidders and complete a walk-through of select buildings with Lightning Pr
AMENDMENT 01: The purpose of this amendment is to schedule the SITE VISIT. SITE VISIT will be held 20 August 2026, at 10:00 a.m. MST. Meeting location will still be BLD 223. Additionally, QUESTIONS due date will be rescheduled from 13 August 2026 to 27 August 2026 at 10:00 a.m. MST, and the PROPOSAL due date will be re
The Mission and Installation Contracting Command (MICC), Fort McCoy, WI has a requirement for a Flooring IDIQ FY26-29 to replace expiring contract W911SA23D2000 at Fort McCoy, WI. (See Attachments)
2027 McConnell AFB Multiple Award Construction Contract (MACC) The 22d Contracting Squadron (22 CONS) of the 22d Air Refueling Wing announces the acquisition of a Multiple Award Construction Contract (MACC) requirement at McConnell AFB, Kansas. The MACC is a firm-fixed price Indefinite-Delivery/Indefinite-Quantity (ID/
This contract opprutunity is set-aside for N4008524D0066 Driven Contractors, LLC. to meet NAVFAC's business standards of providing opprutunites to local disadvantaged and small 8(a) businesses.