TYAD DESIGN BID BUILD CONSTRUCTION PROJECTPROJECT TITLE: LARGE ASSET INTEGRATION FACILITY PROJECT LOCATION: TYAD DESIGN BID BUILD IN ORDER TO CONSTRUCT A COMPLETE AND USABLE LARGE ASSET INTEGRATION FACILITY IN ACCORDANCE WITH THE STATEMENT OF WORK. PERIOD OF PERFORMANCE IS EXPECTED TO BE 457. THIS SOLICITATION IS 100%
The Defense Logistics Agency (DLA) Energy issues Solicitation SPE603-26-R-0530 for comprehensive non-personal Government-Owned, Contractor-Operated (GOCO) fuel services at Naval Air Weapons Station (NAWS) China Lake, California. The selected contractor will be responsible for providing all personnel, equipment, tools,
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commerci
Proposed procurement for NSN 4710004434773 TUBE,METALLIC: Line 0001 Qty 1299 UI FT Deliver To: By: 0122 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach
The purpose of this amendment will be to provide the following: Questions and Answers located on page 2(Solicitation Description) of this amendment. All other terms and conditions remain the same.
Proposed procurement for NSN 2540011924034 BOX,ACCESSORIES STOWAG: Line 0001 Qty 14 UI EA Deliver To: DLA DISTRIBUTION RED RIVER By: 0105 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Spe
Proposed procurement for NSN 2510014706042 PANEL,VEHICULAR OPERAT: Line 0001 Qty 40 UI EA Deliver To: By: 0090 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/orde
Update 31 Aug 2026: Section L attachments "Attachment L-01 FA301026Q0033 Past Performance Reference List" and "Attachment L-02 FA301026Q0033 Past Performance Questionnaire" have been uploaded. ***************************************************************************** Update 27 Aug 2026: Sign-in sheet for pre-bid sit
AMENDMENT 0003 PROVIDES GOVERNMENT ANSWERS FOR ADDITIONAL INDUSTRY QUESTIONS. AMENDMENT 0003 AND Q AND A DOCUMENT UPLOADED. AMENDMENT W912P526BA003002 PROVIDES REVISED DOCUMENTS AS REFERENCED IN THE QUESTIONS FROM INDUSTRY AND ANSWERS FROM GOVERNMENT. AMENDMENT W912P526BA003001 EXTENDS BID DUE DATE TO 3 SEPTEMBER 2026
This is a combined synopsis/solicitation for the Purchase of Emergency Beddown and Readiness Training Equipment, Firm Fixed Price commodity purchase under 100% Service Disabled Veteran Owned Small Business Set Aside. CLIN 0001 Shelter System - 10 each CLIN 0002 Power Distribution - 10 each CLIN 0003 - Light Assembly Ki
AMENDMENT 0001 This amendment is to extend the solicitation to September 4, 2026 at 12 P.M. EDT. All questions are due to the Government no later than August 27, 2026 at 900 A.M. EST. Please see attached PWS for specific scope of work. There is an incumbent to this solicitaiton: W91247-23-F-0036. The prime contractor m
**UPDATED WAGE DETERMINATION INCORPORATED** **Q&A DOCUMENT ADDED** The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to provide and maintain the Postal Service Center (PSC) for authorized personnel at Luke Air Force Base (AFB), Arizona in a mann
The PM MAGTF C2 Program Office requires expert total life cycle acquisition services for all administrative, business, acquisition, finance, costs, program management, and Portfolio Team activities. The contractor shall provide recommendations, assist in the development of draft acquisition products, and finalize acqui
Engineering Safety Training. The Department of Veterans Affairs (VA), Engineering Service, requires select Safety Trainings for select staff positions/duties. Safety training is critical to ensure staff and patient safety when performing various job duties around the facility. The training is required by growing standa
Amendment 0002 - is to post the pre-bid site visit sign-in sheet. See S06 - 36C25226B0011 0002 and attachment S06 Pre-bid Site Visit Sign-in Sheet. Amendment 0001 - is to provide site visit location information details. See S06 - 36C25226B0011 0001 and attachment S06 - Ogden Entrance Location. The Contractor must provi
Proposed procurement for NSN 6545016175668 BAG,MEDICAL INSTRUMENT: Line 0001 Qty 30 UI EA Deliver To: 0087 CS BN CO A COMPOSITE By: 0005 DAYS ADO Line 0002 Qty 2 UI EA Deliver To: COMMANDING OFFICER By: 0005 DAYS ADO Line 0003 Qty 10 UI EA Deliver To: 0068 CS BN CO A COMPOSITE By: 0005 DAYS ADO Line 0004 Qty 1 UI EA De
Amendment 2 is being issued to publish answsers to questions and to provide additioanl campus maps and extend the deadline for the submission of qutoes. Amendment 1 is being issued to publish campus wide maps and to extend the deadline for questions and the deadline for the submission of quotes. The goal of this projec
Proposed procurement for NSN 5985015046104 COUPLER,DIRECTIONAL: Line 0001 Qty 196 UI EA Deliver To: DLA DISTRIBUTION SAN DIEGO By: 0137 DAYS ADO Approved sources are 0SCJ7 D36120; 8MF94 D36120. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not
The Department of Veterans Affairs Greater Los Angeles Healthcare System (VAGLAHCS) requires repair services for failed condensate pumps in Building 200. These repairs are crucial to restore efficient steam system operation and prevent ongoing loss of valuable condensate, which is impacting hospital performance and inc
The purpose of Amendment #2 for the Keating Courthouse Hardening Phase II- Construction solicitation is to incorporate the attachments, "Amendment #1 Keating Courthouse Hardening Phase II- Construction RFI RESPONSE," "AE200 PRE-BID RESPONSE_08262026," "Original wall section," and "Site Visit SignIn Sheet." The Proposal
Subject: Statement of Work: Install Chill Water Lines to Hospice and Audiology Location: Campus Project #: 659-24-203 Date: 26 February 2026 STATEMENT OF WORK Mechanical General: The project involves providing chilled Water from Building 31 primary chiller to serve Buildings 42 and 43. This project should be completed
This amendment adds Attachment C. A site visit is schedule for Thursday, September 3rd @9 am Bldg. 37 POC: Jim Sherry Office: 708-786-7846 Cell: 708-638-3697 James.Sherry@va.gov Questions due date September 11th 4:00 pm cst. Please email all questions to michelle.williams4@va.gov Quotes due October 19th 4:00pm cst. Ple